BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Palm Desert, California. Completed plans call for site work for a water / sewer project.

The anticipated sequence of work for Well 5662-1 includes, but is not limited to, the following: 1. Mobilize equipment to well site. 2. Remove the vertical turbine pump and associated components. a. Remove pump house. b. Inspect pump, motor, column pipe and line shaft. c. Provide inspection report and recommendation for repair. 3. Perform a Casing Inspection Log (CITM), well video survey, caliper log, and deviation survey. 4. Bail or air lift well to remove accumulated material at bottom of well 5. Mechanically brush the inner well casing and screen to remove deposits from the inside walls and screen slots with a wire-line brush tool. Brushing will occur only below a depth of approximately 750 feet below top of casing. 6. Bail or air lift well to remove accumulated material at bottom of well 7. Perform mechanical redevelopment by double swab/airlift with dispersant only in the middle and deep screens. a. Use double-swab/airlift tool to simultaneously swab and airlift the well screen interval. b. Inject and remove approved dispersant polymer from filter pack around well screen using the double swab/airlift tool. 8. Perform post-rehabilitation well video survey to confirm visual effectiveness of rehabilitation. 9. Install a test pump with an inflatable packer system assembly to 775 feet (pump bowls set to approximately 280 feet and pump suction pipe set to 785 feet). 10. Perform 4-hour pumping test on the entire well (with packer un-inflated) at varying rates (step discharge) and then a 4-hour constant discharge rate (estimated 1,750 gpm). 11. Perform a 4-hour step discharge pumping test and a 4-hour constant discharge pumping test with packer inflated. 12. Collect two (2) water quality samples 15 minutes apart within the last 30 minutes of the test. Each sample shall be delivered to Owner or Owner's Representative at the end of the test. 13. Inflate packer system and perform an up to 4-hour pumping test at varying rates (step discharge) and then at a constant discharge rate (estimated 1,750 gpm). 14. Collect two (2) water quality samples 15 minutes apart within the last 30 minutes of each flow rate (20 samples total). Each sample shall be delivered to District or District's Representative at the end of the test. District will perform water quality testing at its lab. 15. Perform water level recovery test. 16. Remove test pump, packer system, motor, and temporary discharge assembly. 17. Perform post-rehabilitation well video survey. 18. Select and place orders for permanent pumping equipment. 19. Disinfect the well and install permanent pumping equipment. 20. Re-install pump house, demobilize, and cleanup the well site. Question Deadline 02/20/2024 at 5:00 PM PT, Online Q&A: Yes Liquidated Damages: $500 per Day Estimated Bid Value: $350,000 Start/Delivery Date: April 2024 Project Duration: 270 Calendar Days License Requirements: C57 Response Types: Line Items General Attachment (required) Type of Award: Lump Sum The Bid Security shall be in the form of (a) cash, (b) a cashier's check made payable to CVWD, (c) a certified check made payable to CVWD, Potential bidders must be able to comply with the Installation Floater/Builders Risk insurance requirements described in Section 5 of the General Conditions. The successful bidder shall provide Installation Floater Insurance, including Flood and Earthquake, for the full amount of the contract. The successful bidder has fifteen ( 15) days following receipt of the Notice of Award to provide insurance documents. The number of days beyond the original fifteen (15) days it takes to receive this will be deducted from the Contract Times.

Award

Water / Sewer

$496,904.00

Public - County

Site Work

3

14

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
68
Bidding Soon
878
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

Multiple Locations, Palm Desert, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.