BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a educational facility.

The Project is generally described as: The removal and replacement of the existing double door located in the elevator lobby of the second floor of the Administration Building, Human Resources Department of the San Francisco Unified School District. Work shall involve (a) the removal of the existing double doors including all associated hardware and door frames and the partial demolition of the ceiling if needed, (b) installation of the new single wood door and fixed window complete with hollow metal frames and associated door hardware, (c) installation of the Aiphone system with all required equipment and devices, wirings, conduits, master control station, etc., (d) construction of required walls, wall base, and finishes, (e) and reconstruction of the affected existing ceiling and walls adjacent to the new work. Performance and Payment Bonds, each equivalent to 100% of the Contract Price, will be required upon award of Contract from the Contractor as part of the terms of the Contract for this project. In general, below is the contract time and milestone schedule: Board Approval: 03/12/2024 (Tentative) Notice to Proceed (NTP): 03/18/2024 Phase 1: Submittals, Procurement: 03/18/2024 thru 04/18/2024 Phase 2: Construction: 04/19/2024 thru 06/30/2024 Final Completion: 07/30/2024, 135 calendar days from NTP. Thirty (30) calendar days from Beneficial Occupancy date of 06/30/2024. Question Deadline 02/08/2024 All questions must be submitted in writing to the District

Award

Office

$37,400.00

Public - City

Renovation

5

8

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
50
Bidding Soon
1,761
All Active Projects
746
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 30, 2024

img_map_placeholder

555 Franklin St, San Francisco, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.