BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work, paving and outdoor lighting for a bridge / tunnel in East Hartford, Connecticut. Conceptual plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; and for paving for a bridge / tunnel.

A detailed scope has not been determined. As of February 17, 2026, further information regarding a design firm has not yet been made available. Construction is expected to start in the spring of this year.

Conceptual

Bridges / Tunnels

$23,900,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
12
Bidding Soon
4,234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

Multiple Locations, East Hartford, CT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.