BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Atascadero, California. Completed plans call for site work for a road / highway.

The inter-water work period is a 12-week window. Construction is expected to take up to 10 weeks although actual length of construction will depend on the capabilities of the selected contractor. Most of the proposed work consists of grading and off-haul of excess material and building the constructed riffles. A total of 23 constructed riffles within 11 treatment areas are proposed throughout the project site (Phase 2). Refer to the attached Technical Specifications document for further details regarding the scope of services. The following construction approach is anticipated for each of the project elements The Upper Salinas - Las Tablas Resource Conservation District is requesting bids from qualified contractors to implement the second phase of the Caltrans Highway 46 Expansion Mitigation project. Phase 1 was completed in 2022 and USLTRCD has secured funding and regulatory agency permits to implement the other half of the project on Centennial Creek between Nickerson Road and Lana Lane in Paso Robles, California. This site is comprised of 6,300 linear feet of waterway in Centennial Creek that runs through the City of Paso Robles' open space in Centennial Park. The work under this contract is being funded by mitigation funds to the USLTRCD from the California Department of Transportation (Caltrans). This is a prevailing wage project. This project includes creating and reestablishing sections of Centennial Creek to restore hydrologic functions by arresting incision and allowing the stream to reconnect with an active floodplain.

Award

Roads / Highways

$856,760.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
11
Bidding Soon
267
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

March 28, 2024

img_map_placeholder

Multiple Locations, Atascadero, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.