BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2024 at 8:00 PM

Updated April 17, 2025

Site work and paving for a road / highway in Orlando, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The College anticipates work to begin in March 2024 with completion in July 2024. The District Board of Trustees of Valencia College is accepting sealed bids from qualified State of Florida Licensed Contractors to provide the remediation of the West Campus perimeter roadway fatigued asphalt pavement, pavement widening to twelve foot-wide travel lanes where deficient, and pavement widening at a single location for development of a left-turn lane. The board may reserve the right to waive minor technicalities.

Award

Roads / Highways

$2,255,455.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
6
Bidding Soon
1,590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 15, 2024

Project location map

1800 S Kirkman Rd, Orlando, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.