BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a transportation facility in Chamblee, Georgia. Working plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

DeKalb County is the Sponsor/Owner-operator of DeKalb Peachtree Airport (PDK). As such, DeKalb County Government (the County) is currently soliciting for Airfield Lighting - LED Design At The DeKalb Peachtree (PDK) Airport (the Project) Deadline for Submission of Questions: 5:00 P.M. ET, Thursday February 29, 2024 Questions must be submitted to the Department of Purchasing and Contracting in writing via email to jhooper@dekalbcountyga.gov Bidder's Price Schedule Form shall be opened and read aloud at an estimated 3 to 5 business days after Bid Opening. Bids will be considered only from experienced and well-equipped contractors Submit One Original Bid Package (Inclusive of the Entire Invitation to Bid Document and Required Documents With the Exception of the Bid Price Form) Stamped "original" and One (1) Flash Drive Containing Two (2) Identical Copies of the Bid Package to the Address Listed Above. No Bid may be revoked or withdrawn until sixty (60) days after the time set for opening the Bids. THE COUNTY RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, TO WAIVE INFORMALITIES IN BIDDING, AND TO READVERTISE. Prior to beginning construction, the successful Bidder will file with the County a Performance Bond and a Payment Bond, each equal to 100% of the Contract Price, with the terms and surety to be approved by the County; and furnish satisfactory proof of carriage of the insurance required. DBE Requirements will supersede the DeKalb First LSBE requirements for this project. The DBE goal for this project is 10.45% Each Bid must be accompanied by a Bid Guarantee in an amount of not less than ten percent (10%) of the amount of the Bid. The Bid Guarantee may be in the form of an official bank check payable to DeKalb County, or a Bid Bond in the form provided in the Bid Document Package. The County reserves the right to reject any or all Bids, to waive informalities, and to re-advertise. The County reserves the right to decide which Bid will be deemed lowest, responsive and responsible. The Contract Time begins within ten (10) days from the date the Contractor acknowledges receipt of the Notice to Proceed, by signing and inserting the acknowledgement date on the Notice to Proceed. Contractor shall fully complete the Work within Ninety (90) Calendar Days. For failure to complete the Work within this period, the Contractor shall pay the County liquidated damages in the amount of One Thousand Dollars and Zero Cents ($1,000.00) for each day in excess of the Contract Time unless an extension of the Contract Time has been obtained by Change Order, as defined in the Contract, prior to the expiration of the Contract Term as defined in the Contract.

Final Planning

Transportation Terminals

$600,000.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
144
Bidding Soon
2,060
All Active Projects
929
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 15, 2024

April 15, 2024

July 14, 2024

img_map_placeholder

2000 Airport Rd, Chamblee, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.