Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 22, 2024 at 7:00 PM

Updated February 23, 2024

Site work and asbestos abatement for a water / sewer project in Bellingham, Washington. Completed plans call for asbestos abatement for a water / sewer project; and for site work for a water / sewer project.

The scope of work for this project consists of furnishing all labor, materials, and equipment necessary for the project identified above including the following major work items: The general scope of work for this project consists of planning, permitting, documentation, removal, and proper disposal of regulated materials in conjunction with general abatement of coatings and residual wastes associated with the Waterfront Digester Tanks at Port of Bellingham facilities in Bellingham, Washington. Engineers estimate: $450,000.00 - $525,000.00 Question Deadline: 02/14/2024 at 5:00 PM PT, Any and all questions related to this project must be submitted via email No questions will be accepted after that time. Deposit in the amount of five percent (5%) of the total amount of the bid by utilizing the Bid Deposit form provided and attaching a certified check or cashier's check payable to the Port of Bellingham. The successful Contractor / Vendor will be required to comply with the bonding requirements of RCW 39.08.010. If a Payment and Performance Bond is used to fulfill this requirement, the successful Contractor / Vendor shall use owner provided Payment and Performance Bond form and shall execute and deliver to the Port of Bellingham the bond or other surety for one hundred percent (100%) of the bid amount for the entire project in compliance with RCW 39.08.010. The Port of Bellingham reserves the right to reject any or all bids and to waive any irregularities or informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $450,000.00 - $525,000.00

Bid Results

Water / Sewer

$431,392.00

Public - City

Asbestos Abatement, Site Work

3

6

4

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
131
Bidding Soon
2,459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 7, 2024

Project location map

Multiple Locations, Bellingham, WA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed