BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Detroit, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

A certified check or bank draft payable to the Owner, or satisfactory Bid Bond executed by the Bidder and Surety Company, in an amount equal to not less than five percent (5%) of the maximum proposal amount shall be submitted with each Proposal, which amount may be forfeited to the Board of Governors, Wayne State University, if the successful Bidder refuses to enter into a Contract within sixty (60) days from receipt of Proposals. The bid deposit of all bidders except the lowest three will be returned within three (3) days after the bids are opened. After the formal Contract and bonds are approved, the bid deposit will be returned to the lowest three bidders, except when forfeited. Bid bonds shall be accompanied by a Power of Attorney authorizing the signer of the bond to do so on behalf of the Surety Company. o Withdrawal of Proposals is prohibited for a period of sixty (60) days after the actual date of opening thereof. A. The successful Bidder will be required to furnish a Performance Bond and Labor and Material Payment bond in an amount equal to 100% of the contract award amount, and include such cost in the Proposal, complying with the laws of the State of Michigan. The graduated formula no longer applies. B. Performance Bond and Labor and Material Payment Bond shall be from a surety company acceptable to the Owner and made payable as follows: (1) A bond for 100% of the contract award amount to the Board of Governors of Wayne State University, and guaranteeing the payment of all subcontractors and all indebtedness incurred for labor, materials, or any cause whatsoever on account of the Contractor in accordance with the laws of the State of Michigan relating to such bonds. (2) A bond for 100% of the contract award amount to the Board of Governors of Wayne State University to guarantee and insure the completion of work according to the Contract. C. The only acceptable Performance Bond shall be the AIA A312 - 2010. 9. BOND CLARIFICATION For bids below $50,000.00, 1. Bid bond will not be required. 2. Performance Bond will not be required. This RFP outlines basic requirements as specified in the Scope of Work section of the RFP (Section III). Proposals submitted are to be in accordance with the outline and specifications contained in and are to remain in effect a minimum of 120 days from the date of submission and may be subject to further extensions as negotiated. Before submitting proposals, each VENDOR will be held to have examined the UNIVERSITY requirements outlined in the Scope of Work and Technical Information sections and satisfied itself as to the existing conditions under which it will be obligated to perform in accordance with specifications of this RFP. Vendors should include a complete description of the products and services offered in their Proposal. The Service Plan should include, but not be limit to: 1.A summary of the products or services to be provided. 2. When applicable, a timeline showing how the Vendor plans to deliver products and/or services to fulfill any contract issued as a result of this RFP. 3.Key staff members at the Vendors organization that will be assigned to the University account or will otherwise be part of an implementation team. 4.Any resource requirements on the part of the University necessary in order for the Vendor to meet its obligations under an agreement resulting from this RFP. 5.Any hardware, software, or other technology the University must have in order to use the Vendors products or services. 6.Any alternative ideas or proposals that should be considered by the University in addition to the base proposal please contact me at (313) 577-3712, or email: Rfpteam3@wayne.edu. Thank you for your interest in doing business with Wayne State University. Wayne State University invites you to participate in its Request for Proposal process to provide Asphalt Paving Spot Repairs Parking 2024, for the Parking, per the specifications contained herein the Request for Proposal. This service is expected to commence on April 15, 2024. All questions concerning this Request for Proposal are to be directed to Robert Kuhn, Sr. Buyer, Email; Rfpteam3@wayne.edu. The deadline for questions is February 14, 2024, 12:00 noon.

Post-Bid

Sidewalks / Parking Lot

$1,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
192
Bidding Soon
2,736
All Active Projects
1,121
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 26, 2024

April 15, 2024

September 30, 2027

img_map_placeholder

Multiple Locations, Detroit, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.