EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 20, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a development in Cheyenne, Wyoming. Conceptual plans call for site work for a development.

The Wyoming State Construction Department, Procurement Section, on Behalf of the Wyoming Game and Fish Department (Procuring Agency) Will Receive Proposals Through the Public Purchase Online System for Professional Services in Support of the Auburn Fish Hatchery, Located in Caribou County, Idaho, in the Caribou-targhee National Forest. It is Approximately 9 Miles West of Grover, Wyoming Off of County Road 134. All Necessary Efforts in Order to Produce a Complete Engineering Design and Production of Complete Construction Documents, Which Will Include (but Are Not Limited to) Plans, Specifications, Bid Schedules, and Special Provisions. Estimated Project Completion Date is: October 31, 2025 Written Questions About the Procurement Process Should Be Submitted Through the Public Purchase Online Bidding System Until 5:00 P.m. Mt, January 3, 2025. Any Questions Received After the Deadline May Not Be Accepted or Considered. Each Question Should Be Submitted Individually. The Procuring Agency Reserves the Right to Amend This Request for Proposal Before the Submission Date Through Written Addenda. Addenda Will Be Published Through Online. It is the Proposer's Responsibility to Check Online for Addenda. The Method of Contractor Selection Has Not Been Determined at This Time. Each Project Valued Equal to or Above $150,000.00, a Bid is Required to Have a Bid Deposit in the Amount of Ten Percent (10%) of the Total Bid, Which Shall Be in the Form of a Bid Bond, Cashier's Check, or Certified Check (a Copy Will Not Be Accepted) Drawn on a Reliable Bank and Made Payable to the State of Wyoming (No Personal Checks Will Be Accepted), or an Electronic Bid Bond With Surety 2000. The Procuring Agency Will Release the Bid Bond if the Bidder is Awarded the Contract; When the Contract is Executed; and When All Additional Documentation Required by Contract is Received and Approved. A Performance Bond and a Payment Bond, Each in the Amount of 100 Percent of the Contract Price, With a Corporate Surety Approved by the Owner, Will Be Required for the Faithful Performance of the Contract.

Conceptual

Conservation and Development

$235,000.00

Public - State/Provincial

Site Work

25

27

11

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
32
Bidding Soon
307
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2026

img_map_placeholder

Multiple Locations, Cheyenne, WY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP Design - Auburn Fish Hatchery Effluent Treatment - Wyoming Game & Fish

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.