BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 29, 2024 at 7:00 PM

Updated March 1, 2024

Site work and renovation of a civil project in Tama, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

This project involves furnishing all labor, materials, and equipment necessary for the construction, installation, and startup of water treatment plant improvements including replacing Aerator; repurposing existing filter as a detention tank; installation of new pumps; installation of new filters; controls; installing electrical equipment; installing 145 LF 6 water main; building roof removal and replacement; and other miscellaneous items required to complete the work. Bid Alternate A includes bringing the detention tank bypass pipe ahead of the low service pumps in the process piping layout. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by the City of Tama and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless The City of Tama from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The guaranteed maintenance period for new paving shall be four years. Est. Value: $ 1,983,000.00 Est. Completion Date: Aug. 8, 2025 ontractor shall complete the project no later than August 8th, 2025. Should the contractor fail to complete the work in this timeframe, liquidated damages of $1,000.00 per calendar day will be assessed for work not completed within the designated contract term. Liquidated damages can be assessed against both completion dates. The City of Tama reserves the right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bids and no bid may be withdrawn during this period.

Bid Results

Water / Sewer

$1,919,000.00

Public - City

Renovation, Site Work

24

16

8

6

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
118
Bidding Soon
1,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

April 29, 2024

Project location map

W 4th St, Tama, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.