BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work for a water / sewer project in Gladstone, Missouri. Design plans call for site work for a water / sewer project.

As of August 7, 2025, per owner, this project is only in preliminary design. Engineer has been identified. Project is expected to bid October 1, 2025. The City of Gladstone is requesting proposals and qualifications from professional engineering firms to assist in the design of transmission main upgrades including a parallel 24-inch main under 1-29 (1,500-feet) and the relocation of 24-inch main (500- feet) in the vicinity of N. Broadway and NW Englewood Road to a manageable depth. The City of Gladstone is located north of the Missouri River and encompassed by Kansas City, Missouri. The City has a population of approximately 27,000 people spread over 9 square miles. The City operates and maintains its own 7.5-MGD lime softening water treatment plant, two (2) water towers, one (1) ground storage tank and pump station, and over 120-miles of water mains ranging in size from 4-inch to 24-inch in diameter. An abbreviated scope of services is listed below: The City of Gladstone is located north of the Missouri River and encompassed by Kansas City, Missouri. The City has a population of approximately 27,000 people spread over 9 square miles. The City operates and maintains its own 7.5-MGD lime softening water treatment plant, two (2) water towers, one (1) ground storage tank and pump station, and over 120-miles of water mains ranging in size from 4-inch to 24-inch in diameter. The City of Gladstone is requesting proposals and qualifications from professional engineering firms to assist in the design of transmission main upgrades including a parallel 24-inch main under 1-29 (1,500-feet) and the relocation of 24-inch main (500- feet) in the vicinity of N. Broadway and NW Englewood Road to a manageable depth. 1. Review existing reports and studies as necessary. 2. Complete any field surveying as necessary to complete the design. 3. Complete the detailed design of improvements incorporating input from industry experts regarding constructability due to the proximity to the interstate system. 4. Obtain all necessary construction permits from the Missouri Department of Natural Resources and the Missouri Department of Natural Resources. 5. Assist with the City with bidding and construction services as necessary. Questions concerning the project should be directed to Tim Nebergall by phone at (816) 436-5442 or by e-mail at timn@gladstone.mo.us.

Design

Water / Sewer

$3,640,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
64
Bidding Soon
1,089
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

Project location map

Multiple Locations, Gladstone, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.