BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2024 at 8:00 PM

Updated May 28, 2024

Site work and paving for a bridge / tunnel in Winnipeg, Manitoba. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The scope of work will consist of Rehabilitation/Repair works for the SU11 Cofferdam at Bridge Site No.: 1662-00 on PTH 4 over the Red River, River Lots 50, 51, 203 and 204 - Parish of St. Peters R.M. of St. Andrews and St. Clements. LIQUIDATED DAMAGES SUBCOMPLETION Stage 2 and Stage 3 as defined under CONSTRUCTION STAGING shall be completed before spring icebreakup, or in any case no later than MARCH 31, 2024. Daily Liquidated Damages after this specified Interim Completion Date will be charged to the Contractor at the rate of FIVE HUNDERED ($500.00) Dollars per calendar day until the Work is completed. COMPLETION Stage 4 as defined under CONSTRUCTION STAGING and all remaining works shall be completed by SEPTEMBER 30, 2024. Daily Liquidated Damages after this specified Completion Date will be charged to the Contractor at the rate of FIVE HUNDRED ($500.00) Dollars per calendar day until the Work is completed. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Under Construction

Bridges / Tunnels

$713,950.00

Public - State/Provincial

Paving, Site Work

107

5

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
36
Bidding Soon
542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 20, 2024

Project location map

MB-59, Winnipeg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.