BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Simi Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

If you discover any error or omission in the plans, specifications, or proposal, or have any question concerning the bidding documents, please contact: Fuad Shamout Principal Engineer, Capital Projects Department of Public Works 2929 Tapo Canyon Road Simi Valley, CA 93063 Telephone (805) 583-6788 fshamout@simivalley.org SCOPE OF WORK: Scope of Work Schedule I The Minor Streets Rehabilitation Program Schedule I will consist of: 1) 139,235 S.F. of asphalt pavement cold milling; 2) 1,305 tons of asphalt placement; 3) 704 S.F. of sawcut, removal, and reconstruction of sidewalk; 4) 12 sawcut, removal, and reconstruction of curb ramps; 5) 1,005 S.F. of sawcut, removal, and reconstruction of concrete cross and/or longitudinal gutter; 6) 148 L.F. of concrete sidewalk grinding; 7) 77 L.F. of sawcut, removal, and reconstruction of concrete curb and gutter; 8) 12 sewer manhole frame and cover replacement; 9) traffic signing and pavement delineation; 10) construction surveying; and 11) all appurtenant work as provided in the Proposed Schedule of Work and Prices. Scope of Work Schedule II The Minor Streets Rehabilitation Program Schedule II will consist of: 1) 267,052 S.F. total of asphalt pavement cold milling; 2) 2,504 tons of asphalt placement; 3) 750 S.F. of sawcut, removal, and reconstruction of sidewalk; 4) 20 sawcut, removal, and reconstruction of curb ramps; 5) 90 S.F. of sawcut, removal, and reconstruction of concrete driveways; 6) 140 L.F. of concrete sidewalk grinding; 7) 79 L.F. of sawcut, removal, and reconstruction of concrete curb and gutter; 8) 15 sewer manhole frame and cover replacement; 9) 154,063 crack seal; 10) slurry seal; 11) traffic signing and pavement delineation; 12) construction surveying; and 13) all appurtenant work as provided in the Proposed Schedule of Work and Prices. The specified completion time for time for Schedule I and II combined is 40 consecutive days after receipt of the Notice to Proceed. Bid Result Bid Amount Item #1-Toro Enterprises Inc - 2409575 Bid Amount Item #2-Toro Enterprises Inc -3504174

Award

Roads / Highways

$5,913,749.00

Public - City

Paving, Site Work

35

14

4

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
84
Bidding Soon
1,846
All Active Projects
881
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

July 29, 2024

img_map_placeholder

Multiple Locations, Simi Valley, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.