BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2024 at 7:00 PM

Updated February 8, 2024

Site work and paving for a road / highway in Perrysburg, Ohio. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of February 7, 2024, this project is in the early design and study phase. A firm timeline for construction has not been determined. Project No. 117678 Feasibility Study ID# 112559 A study to develop 3 alternatives that will improve safety performance at the interchange of Wood County IR-75/U.S. Route 20/U.S. Route 23 (Fremont Pike) Exit 193.

Design

Roads / Highways

$25,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
185
Bidding Soon
2,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

Project location map

Fremont Pike and I-75, Perrysburg, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.