Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2024 at 8:00 PM

Updated July 2, 2024

Demolition, site work and renovation of a transportation facility in Belgrade, Montana. Completed plans call for the demolition of a transportation facility; for site work for a transportation facility; and for the renovation of a 349,083-square-foot, two-story above grade transportation facility.

As of May 29, 20204, this project is under construction and completion expected December 2024. Project Description: The Enabling Package Schedule 0 is the first bid package of work that prepares Gallatin Airport Authority to continue with future terminal demolition and construction. Martel Construction is seeking bids for all scopes of work generally consisting of, but not limited to the following: Demo, Concrete, Structural Steel, Carpentry, Insulation, Metal Siding, EIFS, Storefront , Doors and Hardware, Metal Framing, Drywall, Painting, Wall Covering, Acoustic Ceilings, Signage, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications, access Control, Fire Alarm, Excavation, and Backfill and Baggage Handling Systems. This work is to include all tools, equipment, materials and labor to complete this project. Martel Construction will be seeking subcontractor and supplier bids for this project. Project Contacts: Please direct all bids and questions to Travis Kabalin at tkabalin@martelconstruction.com and Mike Wilkinson at mwilkinson@martelconstruction.com and Tyler Ragen at tragen@martelconstruction.com

Under Construction

Transportation Terminals

$8,052,000.00

Public - County

Demolition, Renovation, Site Work

153

34

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

May 6, 2024

Project location map

850 Gallatin Field Rd, Belgrade, MT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed