Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 10, 2025
Site work, paving and outdoor lighting for a mixed-use development in Truckee, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; playground / park / athletic field; road / highway; road / highway; and for outdoor lighting for a road / highway.
The Project includes a proposed trail that has a slightly undulating alignment to avoid mature trees, two spur pathways leading into features within the sports complex, and cut/fill excavation and embanks to build to the designed trail grade. The proposed Class 1 trail is 10 feet-wide, with 2-foot shoulders on each side (14 feet total width) and approximately 1,200 feet long and will have an aggregate base road shoulder along the west side and an infiltration trench installed along the east side. A rock berm on the north end to reduce the grade transition on the slope at the Legacy Trail spur connection. A connector pathway located between the playing fields will provide access into the middle of the park and a bench, interpretative signage, and bike racks will be installed at this junction. Trail traffic control improvements in the form of stop signs and chicanes are included to the southern part of the connection to calm bike traffic approaching the park entrance at Joerger Drive. Solar lighting along the trail will also provide lighting where deemed necessary. Highway 267 - East on Soaring Way - North on Joerger Drive - Left into Riverview Sports Park Engineers Estimate: 700,000 Time of Completion for overall project: 45 WORKING (~9 calendar weeks) Liquidated Damages: 1,750 per Calendar Day All Requests for Information (RFIs) shall be submitted by e-mail directly to smathottownoftruckee.gov by Wednesday June 4, 2025, 10:00 AM. For more information, please contact Scott Mathot, Project Manager at smathottownoftruckee.gov or 530-582-2481.
Award
Roads / Highways
$732,060.00
Public - City
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 14, 2025
12304 Joerger Dr, Truckee, CA
Related To This Project
Truckee, CA
Bid Date: Mar 12 2024
Truckee, CA
Bid Date: Mar 28 2024
Truckee, CA
Bid Date: Mar 29 2024
Truckee, CA
Bid Date: May 01 2024
Truckee, CA
Bid Date: Apr 30 2024
Truckee, CA
Bid Date: May 02 2024
Truckee, CA
Bid Date: Mar 18 2025
Truckee, CA
--
Truckee, CA
Bid Date: Apr 25 2024
Truckee, CA
Bid Date: Feb 06 2024
Truckee, CA
--
Truckee, CA
--
Truckee, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
