BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Santa Clara, California. Completed plans call for site work for a power facility; and road / highway.

**As of April 3, 2024 , this project has not yet been awarded. It is scheduled for an April 9th Council meeting.** DESCRIPTION OF WORK. The purpose of the proposed SVP project is to extend an existing 60 KV overhead transmission line to provide service to a new substation (Stender Way Junction Substation). The substation will be designed and constructed by Others and will be located on the northeast corner of Central Expressway and Stender Way Street, in Santa Clara CA. The transmission line will initially be energized at 60 KV, but has been designed for two 115 kV circuits. The total length of new transmission line is approximately 0.3 miles. The new transmission line includes rebuilding 4 existing transmission spans (which are not currently energized). The transmission conductor is bundled 715 kcmil ACCR "Stilt". Work includes the installation of 5 custom tubular steel monopoles supported on drilled concrete piers, and 2 direct embedded steel poles. Question Deadline 02/19/2024 at 5:00 PM PT

Award

Roads / Highways

$1,597,659.00

Public - City

Site Work

121

16

4

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
73
Bidding Soon
1,484
All Active Projects
641
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 6, 2024

img_map_placeholder

Stender Way, Santa Clara, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.