BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2024 at 7:00 PM

Updated September 9, 2025

Site work and paving for a mixed-use development in Milton, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The MILTON HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Road and Sidewalk Reconstruction at State Aided Development: Miller Avenue Apartments (667-1) in Milton, Massachusetts, in accordance with the documents prepared by ALLEN & MAJOR ASSOCIATES, INC. The Project consists of but not limited to: Remove and reconstruct Miller Ave asphalt roadway. Remove and reconstruct bituminous curbing along Miller Ave. Cleanly sawcut. Erosion control measures. Remove and reconstruct portion of bituminous sidewalk along Miller Ave. Remove and reconstruct portion of bituminous sidewalk on 65 Miller Ave development. Use caution around existing trees and roots. Loam and seed all disturbed areas. The work is estimated to cost $99,000.00. All bidding Requests for Information (RFls) shall be submitted online by 02/21/2024 at 10:00 AM EST for general bids. Bids are subject to M.G.L. c.30/39M and to minimum wage rates as required by M.G.L.c. 149 //26 to 27H inclusive. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the MILTON HOUSING AUTHORITY. The participation goals for this project shall be 15.3% for minorities and 6.9% for women. Note: A bid deposit is not required for Projects advertised under $50,000.

Bid Results

Roads / Highways

$86,890.00

Public - City

Paving, Site Work

7

12

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
315
Bidding Soon
4,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

Project location map

65 Miller Ave, Milton, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.