BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Wheaton, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 26% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 2, 2024, at 8:30 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide construction engineering for subject improvement. Work includes, but is not limited to, reconstruction of the intersection of IL 53 & IL 56 and all four roadway approaches to provide three 12-foot lanes in each direction along IL 56 to increase capacity from the current two 12-foot lane configuration. East of the IL 56 reconstruction limits, resurfacing of IL 56 will be performed from Lloyd Ave. to I-355. The scope on IL 53 includes pavement reconstruction and both raised and striped medians. Additionally, dual left turn lanes and one right turn lane will be constructed at each leg on the IL 56 and IL 53 intersection. The project also includes deck replacement with a single beam replacement of the existing bridge over the East Branch of the DuPage River on IL 56, removal of existing north sidewalk on the bridge, addition of a south sidewalk, the removal of existing pile supported approach slabs and replacement with full width approach slabs. The existing storm sewer and drainage system will be removed and replaced which includes multiple box culverts along the south side of IL 56 from Arboretum Road to IL 53. The project will include pedestrian accommodations along with a proposed pedestrian bridge over the East Branch DuPage River on the north side of IL 56 to serve pedestrians and bicycles access to the adjacent Park District facilities. A 500-foot-long Ground Mounted Noise Abatement Wall will be constructed along IL 56 from Gray Avenue to Bob O'Link Road. The proposed improvements will require modernization of existing traffic signals at the intersections of IL 56 / IL 53 and IL 56 / Lloyd Avenue as well as two interconnect systems to provide traffic flow progression. Lastly, a single-unit residence at the northwest corner of IL 53 and Arboretum Road will be demolished. Any and all incidental work necessary to complete the project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 03 - RFQ - IL 56 (Butterfield Rd): IL 53 to I-355, Phase III Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
87
Bidding Soon
1,740
All Active Projects
753
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.