Published February 29, 2024 at 7:00 PM
Updated March 1, 2024
Site work and asbestos abatement for a residential development in Benld, Illinois. Completed plans call for site work for a residential development; and for asbestos abatement for a residential development.
Interior Abatement work at its Benldsite Those with questions may contact Dave Parker, Architect, 213 South Sixth Street, Springfield Il. 217-789-9515 or Dan Sanson at MCHA 217-854-8606. SITE 47-1 500 8TH STREET, 801, 803 AND 815 CHESTNUT, BENLD, ILLINOIS Asbestos Abatement Contractor (AAC ) remove attached fittings, fixtures and casework, all drywall and building insulation. General Contractor administer AAC, remove Appliances, equipment and fixtures not attached to ceilings or walls, interior doors, window treatments, wiring, ductwork and piping, etc. GC remove and reinstall exterior doors as required. A. Scope of pre-demolition and abatement work is indicated on drawings. B. Scope of demolition and removal work is indicated on drawings. C. Renovate the following areas, complete including operational mechanical and electrical work and finishes: 1. Interior at 500 8th street and 801, 803 and 815 Chestnut Street. 2. Unit 500 is unoccupied, but adjacent unit is not. Provide barriers and sound control as required to allow continued occupancy of adjacent unit.. D. Plumbing: Remove existing and cap service entrance.. 1. Work includes above remove grade waste, vent and supply piping, water heater, remove gas lines to main entrance. 2. Cap water and gas at service entrance and waste piping at floor. Block floor drains. 3. Cut off vent piping below roof sheathing. E. HVAC: Remove existing and cap penetrations.. 1. Remove ductwork, vents, etc. as shown. 2. Pump down coolant and remove condenser from roof. Cap roof penetration. F. Electrical Power and Lighting: Remove existing and cap service entrance.. 1. Remove light fixtures and devices in walls and above ceiling, including fire detectors. 2. Remove wiring and boxes in walls and above ceiling 3. Cut off wiring at exterior fixtures inside building. 4. Remove low voltage and communication wiring and plug penetrations 5. Existing meter and service drop to remain. G. MCHA may remove the following items before start of work: 1. Appliances. 2. Equipment. 3. Fixtures. The Project consists of the interior partial demolition & asbestos abatement of 4 housing units at Site 47-1, Benld, Illinois consisting of the following outline scope:. Asbestos Abatement Contractor (AAC ) remove attached fittings, fixtures and casework, all drywall and building insulation. General Contractor administer AAC, remove appliances, equipment and fixtures not attached to ceilings or walls, interior doors, window treatments, wiring, ductwork and piping, etc. GC remove and reinstall exterior doors as required. AAC may act as GC.
Bid Results
Residential Subdivision
$109,800.00
Public - County
Asbestos Abatement, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2024
March 25, 2024
813 E Chestnut St, Benld, IL
Related To This Project
Benld, IL
Bid Date: Apr 09 2024
Benld, IL
Bid Date: Aug 27 2024
Benld, IL
Bid Date: Aug 27 2024
Benld, IL
Bid Date: Sep 13 2024
Benld, IL
Bid Date: Oct 31 2024
Benld, IL
Bid Date: Mar 27 2025
Benld, IL
Bid Date: Aug 13 2025
Benld, IL
Bid Date: Aug 05 2025
Benld, IL
Bid Date: Feb 23 2024
Benld, IL
--
Benld, IL
Bid Date: Aug 18 2023
Benld, IL
Bid Date: Aug 03 2023
Benld, IL
Bid Date: May 24 2023
Benld, IL
Bid Date: Feb 18 2023
Benld, IL
Bid Date: Jul 05 2022