BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Channahon, Illinois. Contact the soliciting agency for additional information.

This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 24, 2024, at 1:00 PM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for the preparation of contract plans, TS&L plans, structure plans, specifications, cost estimates, supplemental surveying, geotechnical services, lighting design, traffic signals, all applicable permits, and all other work to complete the improvements for I-55 Interchange (FAI 55) at Illinois Route 126. The project's scope includes reconstruction of a new diamond interchange at Illinois Route 126 with the realignment of IL 126 as a two-way roadway west of I-55. The improvement includes, but not limited to, bridge widening, bridge replacement, proposed retaining walls, ramp construction, traffic signal installation, drainage improvements, and all other related work to complete Phase II contract plans. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 24 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Advanced Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 17 - RFQ - I-55 at Illinois Route 126 Phase II Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
85
Bidding Soon
1,889
All Active Projects
834
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

img_map_placeholder

I-55, Channahon, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.