Site work and asbestos abatement for an educational facility in La Grange, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Lyons Township High School 2024 Asbestos Abatement Work will start June 3 and be phased through June and July. The work includes the following: Base Bid - South Campus - o 1st phase will be ACM pipe insulation removal in the E wing. Scope includes gross removal of all ACM pipe insulation in the tunnels as shown on the drawings. Alternate Bid 1 applies to this phase. AAC start on containments for next phase during clean period. o 2nd phase will be ACM pipe insulation removal in the G wing. Scope includes gross removal of all ACM pipe insulation in the tunnels as shown on the drawings. Scope includes glovebag removal on the 1st floor and above the first floor ceiling in mini-containments. GC will open chase walls and ceiling, AAC will abate. Scope includes intact removal of floor tile at B wing-G Wing connector and Storage Room S.B.1. AAC start on containments for next phase during clean period. o 3rd phase will be ACM pipe insulation removal in the D wing. Scope includes gross removal of all ACM pipe insulation in the basement storage area and subsequent glovebag removal of pipe insulation in mini-containment in tunnel south of gross removal area. Scope includes glovebag removal on the 1st floor and above the first floor ceiling in mini-containments. GC will open chases and walls (assumed to run piping up to fixtures and into ceiling) and ceiling, AAC will abate. Scope includes removal of interior door sealant in a mini containment. o Exterior Doors (2) as indicated at the D wing abatement area. May be done from the exterior as EPA work. Coordinate with GC. o Exterior and interior door sealant as indicated at the north end of the B wing. Requires containment for interior doors. Coordinate with GC. Alternate Bid 1 - Phase 1, South Campus - o Glovebag work at four bathrooms as identified on drawings. GC will open chase walls, Abatement Contractor (AAC) will set up mini-containments, abate, area will be cleared and AAC will take down containments. Work includes a 2-story stack between 2 restrooms and glovebag work in the tunnels below at connections and 2' either side on mains. Alternate Bid 2 - North Campus - o Removal of exterior door sealant at multiple locations as identified on the drawings. All Bidders are requested to attend this meeting and to participate in a walk-through of the facility. Bids shall include: 1. Properly completed Proposal Form in duplicate. 2. Not less than the prevailing hourly wage rate as determined by the Illinois Department of Labor pursuant to Illinois Revised Statues, Ch. 489, Sec. 39s-1 et.seq. 3. Bid Security in the amount of 5% of the bid. All Bidders are advised that the law concerning prevailing wage rates must be complied with. Prevailing wage rates have been determined and are on file at the office of the State of Illinois, Department of Labor or on their website. Bidders must be prequalified with the State of Illinois, Department of Public Health and meet the requirements of the latest edition of the Illinois Asbestos Abatement Act and Rules and Regulations. Bidders must be prepared to submit evidence of prequalification with the Department of Public Health and a current audited financial statement to the Office of the Superintendent upon request of the Owner or Specialist. All Bidders shall submit and enclose with their bid a certification that the Contractor is not barred from bidding on the Contract as a result of a violation of either Section 33 E-3 or 33 E-4 of Article 33E, Public Act 85-1295 (Senate Bill 2002) effective January 1, 1989. Certification is located in the Proposal Form, Section 00300, of the Specifications. Bids shall be accompanied by a bid bond, certified check or cashiers check in the amount of 5% of the bid made payable to Lyons Township High School. Failure of bidder to submit bid bond, certified check or cashier's check in amount to cover proposals bid upon is cause for rejection of bid. Successful Bidder will be required to provide Surety Performance Bond and Labor and Material Payment Bond, each equal to 100 percent of the contract price on prescribed forms within 5 days after notice of acceptance is issued by Owner. Surety on bonds shall be by duly authorized company acceptable to the Owner. The Owner reserves the right to reject any or all bids and reserves the right to waive any irregularity in bidding, which in their considered opinion is warranted.

Bid Results

Educational

$185,000.00

Public - County

Asbestos Abatement, Site Work

12

8

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
174
Bidding Soon
3,129
All Active Projects
1,346
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 5, 2024

June 3, 2024

July 31, 2024

img_map_placeholder

100 S Brainard Ave, La Grange, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.