BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2024 at 7:00 PM

Updated August 21, 2024

Site work and outdoor lighting for a bridge / tunnel in Ewing, New Jersey. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

Maintenance Route 29 Tunnel Lighting System Improvement Contract, Route 29 Tunnel, Mercer County; 100% State, PE No: 2622635, CE No: 2622887 (STRUCTURE NO. 1130-158) Estimated Completion Date on July 18th, 2025 Estimated Range between 2,500,001 to $5,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 7 Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d) Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning the Contract. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33 NJDOT: 411 - Maintenance Route 29 Tunnel Lighting System Improvement Contract *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$4,658,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

88

8

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
935
Active Projects
390
Bidding Soon
7,166
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 29, 2024

Project location map

NJ-29, Ewing, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.