BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Boston, Massachusetts. Completed plans call for site work for a educational facility.

provide the installation and purchase of a grandstand, bleachers, press box, and accessible lift, complete with all their associated materials and components If an alternate includes work within the Bidder's scope of work and does not involve a change in the cost of the Bid, the Bidder shall so indicate by writing "No Change" or "N/C" or "0" in the space provided for that alternate. The Contractor shall have successfully completed at least three (3) projects of similar size, scope and complexity within the last five (5) years, which shall be documented by providing references An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date Scope of Work. The Work under this Contract is defined as all work required by the Contract Documents for the construction of UMB Clark Athletic Center - Softball Field Grandstands, Contract No. BOSADM-2024-0608, in accordance with and as described in the Plans and Specifications The Work comprises the completed project described in the Contract Documents and includes all labor, professional services, transportation, tools, materials, supplies, equipment, permits, approvals, documents, calculations, submittals, and certificates necessary to develop, perform, construct and complete the project in accordance with all applicable laws, ordinances, and regulations, and in accordance with the Contract Documents A written order not requiring the consent of the Contractor, signed by the Project Manager and designated as a Change Order, directing the Contractor to make changes in the Work within the general scope of the Contract, or (2) any written or oral order from the Project Manager that causes any change in the Work, provided that the Contractor has given the Awarding Authority written notice stating the date, circumstances, and source of the order and that the Contractor regards the order as a Change Order. A change order may be issued by the University of Massachusetts Boston for changes in the Work within the scope of the Contract, including but not limited to, changes in: (1) the Plans and Specifications; (2) the method or manner of performance of the Work; (3) the University of Massachusetts Boston - furnished facilities, equipment, materials, services, or Site; or (4) the schedule for performance of the Work. The Contractor shall immediately perform any change order work that is orderedin writing by the University of Massachusetts Boston . The Commonwealth certifies that at the time of the execution of this Contract, sufficient appropriations exist and shall be encumbered to fund the Contract Price. Payments are subject to appropriation and shall be made only for work performed in accordance with the terms of this Contract. The Contractor shall not be obligated to perform, and may not perform, work outside the duration and scope of this Contract without an appropriate amendment to this Contract, and a sufficient appropriation(s) to support such additional work. The Commonwealth may immediately terminate or suspend this Contract in the event that the appropriation(s) funding this Contract is eliminated or reduced to an amount which will be insufficient to support anticipated future obligations under this Contract. The University of Massachusetts Boston also reserves the right to reject any bid if it determines that such bid does not represent the bid of a person competent to perform the work as specified or if less than three (3) available bids are received Except as otherwise provided herein, the University of Massachusetts Boston's inspection of the Work shall not relieve the Contractor of any of its responsibilities hereunder, and defective work shall be corrected. The University of Massachusetts Boston may reject unsuitable work, notwithstanding that such work and materials have been previously accepted for payment. If any part of the Work shall be found defective at any time before the final acceptance of the whole Work, the Contractor shall promptly correct such defect in a manner satisfactory to the University of Massachusetts Boston . If any material brought upon the site for use in the Work shall be rejected by the University of Massachusetts Boston as not in conformity with the Contract Documents, the Contractor shall promptly remove such materials from the site. Each bid must be accompanied by a Bid Deposit. Bid Deposits shall be five (5%) percent. Bid Deposits shall be made payable to the University of Massachusetts Boston or the Commonwealth of Massachusetts and shall be either in the form of cash, certified check, treasurer's or cashier's check issued by a responsible bank or trust company, or a bid bond issued by a surety licensed to do business in the University of Massachusetts Boston; and shall be conditioned upon the faithful performance by the principal of the agreements contained in the bid.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,100,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
351
Active Projects
223
Bidding Soon
2,702
All Active Projects
1,231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

April 23, 2024

img_map_placeholder

100 Morrissey Blvd, Boston, MA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.