Site work for a civil project in Honolulu, Hawaii. Conceptual plans call for site work for a water / sewer project.

As of April 6, 2024, a contractor has not been selected. It is anticipated a formal solicitation for a contractor will be issued mid-May 2024. The new solicitation number has not been determined. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: THIS IS A SOURCES SOUGHT NOTICE and is for information purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION, OR INVITATION FOR BID. The U.S. Army Corps of Engineers, Honolulu District, requests letters of interest from Prime Contractors AND Subcontractors interested in performing work on a potential design-bid-build construction solicitation for Hawaii Water Management Irrigation System Improvements, Waiahole and Kokee Reservoir System, Island of Oahu, Hawaii. NO SOLICITATION IS CURRENTLY AVAILABLE. Project Description: The U.S. Army Corps of Engineers, Honolulu District, through the Civil and Public Works Branch, proposes to conduct improvements to the Waiahole Irrigation System located at the Waiahole Ditch Irrigation System in the central part of the Island of Oahu. Project Scope: The overall purpose of the project is to improve to two small reservoirs used for irrigation water storage along the Waiahole Ditch Irrigation System. Improvements will include geometry corrections of the reservoir embankment, new inlets, outlet and spillway works, and a high density polyethylene (HDPE) liner in the interior of the reservoirs. The major elements of the scope of work include: pre-mobilization activities; compliance with applicable environmental requirements; mobilization which includes preparation of temporary construction staging and dewatering areas, clearing, grubbing and stripping of reservoir slopes, crest, and proposed footprint, dewatering of reservoirs and temporary closures, removal of sediment from reservoirs, excavation of existing reservoirs embankments, installation of new outlet works tying into existing facilities at the downstream toe, installation of new intake and slide gate for proposed outlet pipe, installation of new pumps, construction of new embankment, construction of new spillway and inlet structures, erosion control seeding and construction of irrigation system, installation of HDPE liner, utility relocation, dewatering of the sediment according to specified environmental best management practices; transportation of the dewatered sediments to the PVT Landfill as the upland disposal site; and, demobilization which includes the restoration of the temporary construction staging and dewatering areas to their original condition. (1) Reservoir 155 is an earthen-filled structure built during the later 1920s. It is approximately 22 feet deep and has a storage capacity of 18 mgal of water. Reservoir 155 will be excavated to increase its storage capacity and lined to reduce seepage losses. Repairs will also be made to the overflow channel and a new sediment trap and inlet screen will be constructed. (2) Reservoir 225 is an earthen-filled structure built during the later 1920s. It is approximately 15 feet deep and has a storage capacity of 9.5 mgal of water. Reservoir 225 will be excavated to increase its storage capacity and lined to reduce seepage losses. A new sediment basin will be constructed in the reservoir and a new debris screen will be installed at the reservoir inlet. The estimated performance of period is 24 months. Magnitude is $10M to $25M. Interested Prime Contractors should submit the following: a. Narrative demonstrating successful completion of construction projects of similar scope and complexity to the subject project. Project narratives submitted should include construction of embankments with a minimum quantity of 25,000 cubic yards in the State of Hawaii or at a remote location similar to Hawaii (must describe how the location was similar to Hawaii in terms of the logistical (i.e., personnel, materials, equipment, transportation) challenges and/or considerations inherent in a project location that is isolated) within the last 5 years. The project must have also included responsibilities for the dewatering and disposal of excavated material; If the contractor does not have specific project experience, provide a narrative demonstrating its technical approach and methodology in completing the work (including all major elements of the scope of work described above) to be performed for the subject project. b. Narrative demonstrating experience with HDPE liner installation in similar size and scope of the work to be performed for the subject project; c. Narrative demonstrating experience in complying and coordinating with Federal, State of Hawaii, and local environmental agencies; d. Bonding capability for a single contract action of at least $15M and aggregate of at least $25M by the interested prime contractor. e. UEI and CAGE CODE, Expiration date in SAM.GOV. f. Indicate whether your firm is a large business or small business and indicate applicable socio-economic category of FAR PART 19. Narratives shall be no longer than two (2) pages. Email responses are required. Responses are to be sent via email to brett.j.watanabe@usace.army.mil and tristin.n.suetsugu@usace.army.mil no later than February 22, 2024, 2:00 p.m. Hawaii Standard Time. Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. It is a market research tool being utilized to determine the availability of potential qualified contractors before determining the method of acquisition. Please note that it is required that your company be registered in the System for Award Management (SAM), please see www.SAM.gov for additional information. In addition, this sources sought is not to be construed as a commitment by the government, nor will the government pay for any information solicited or delivered. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$25,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
97
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

img_map_placeholder

Multiple Locations, Honolulu, HI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.