BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Dobbin, Texas. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Demolition of the existing lift station site and construction of a proposed twelve-foot (12') diameter submersible lift station including but not limited to a wet well, three (3) submersible pumps with accessories, associated piping, valves, header and force main; manhole; influent sanitary sewer line; a potable water line with backflow preventer; concrete pavement; Natural Gas Powered Emergency Generator, automatic transfer switch, electrical duct banks, conduit, wiring, starters, breakers, control panel; site grading; fence, dewatering, trench safety, and all other items as necessary for a complete functioning lift station. The deadline to ask questions is 2/29/2024 12:00 PM CST. Questions for this project will be accepted up until noon the Thursday prior to Bid Opening. Responses to questions will be provided in addendum form in accordance with the Instructions to Bidders. No responses will be provided through the online Q/A platform. Bid security shall be furnished in accordance with the Instructions to Bidders. A Bid must be accompanied by Bid security made payable to Owner in an amount of two percent of Bidder's maximum Bid price. When Contractor delivers the signed counterparts of the Agreement to Owner, Contractor shall also deliver to Owner the performance bond and payment bond (if the Contract requires Contractor to furnish such bonds). When Contractor delivers the signed counterparts of the Agreement to Owner, Contractor shall also deliver to Owner the performance bond and payment bond (if the Contract requires Contractor to furnish such bonds). Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $750.00 for each day that expires after such time until the Work is completed and ready for final payment. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently.

Bid Results

Water / Sewer

$1,770,000.00

Public - County

Demolition, New Construction, Paving, Site Work

27

25

4

7

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
210
Bidding Soon
4,204
All Active Projects
1,721
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 5, 2024

April 4, 2024

img_map_placeholder

To Be Determined, Dobbin, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.