Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Marengo, Illinois. Working plans call for site work for a water / sewer project.
BID SECURITY - No Bid shall be received unless accompanied by a Certified Check or satisfactory Bid Bond payable to the City of Marengo in an amount not less than ten percent 10% of the maximum Bid as a guarantee that, if the Bid is accepted, the Bidder will execute and file the Contract, Performance/Payment Bonds and Insurance Certification, as required by the Contract Documents, within ten (10) days after the Notice of Award. BID REJECTION - The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the City of Marengo. WITHDRAWAL OF BIDS - No Bid shall be withdrawn for a period of 90-days after the scheduled opening without the consent of the OWNER. BIDS Notes - All Bids shall be addressed to Stephanie Matysiewski, City Clerk, City of Marengo, 132 E. Prairie Street, Marengo, IL 60152. Bids shall be sealed and shall have the name and address of the contractor and the contract for which the Bid is being submitted on the outside of the envelope. All contractors shall bid in accordance with and upon the Bid forms included in the contract documents. PROJECT - The work shall consist of the construction of a Water Treatment Addition to the existing Water Booster Pumping Station, along with approximately 8,800 linear feet of associated 8-inch and 12-inch water transmission mains. This project is being financed with funds from the IL Department of Commerce and Economic Opportunity (DCEO) and supported, in whole or in part, by federal award number SLT-3381 awarded to the State of Illinois by the U.S. Department of the Treasury. The State of Illinois has determined that the Business Enterprise Program (BEP) is 15% with 10% of the grant dollars going to minority owned business enterprises (MBE or WMBEs) and 5% of the grant dollars going to women-owned business enterprises (WBE or WMBE). Only SUBCONTRACTORS or Suppliers certified through the State of Illinois Central Management Services' (CMS') Business Enterprise Program will count toward meeting the BEP utilization for this grant. Minimum Wage 1. The CONTRACTOR shall be required to pay not less than the minimum wage rates established by the OWNER, as stated in the Invitation For Bids. 2. References to applicable wage rates are on file with the OWNER and/or incorporated in the contract documents. The CONTRACTOR and all subcontractors shall be required to pay wages, as applicable, in accordance with the Davis Bacon Act (40 U.S.C. 276a - 276a-7). The minimum hourly rate of wages, as determined by the Wage Determination Decision of the Department of Labor or the above-referenced Davis-Bacon wage rates, whichever is higher and referred to in these standards is included in the bid documents. Published by the authority of the City of Marengo acting through its City Council.
Final Planning
Water / Sewer
$2,984,349.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2024
October 26, 2024
To Be Determined, Marengo, IL
Related To This Project
Marengo, IL
Bid Date: Mar 27 2024
Marengo, IL
Bid Date: Mar 06 2024
Marengo, IL
Bid Date: Mar 05 2024
Marengo, IL
Bid Date: May 23 2024
Marengo, IL
Bid Date: Mar 13 2024
Marengo, IL
Bid Date: Mar 13 2024
Marengo, IL
Bid Date: Feb 26 2019
Marengo, IL
Bid Date: May 21 2024
Marengo, IL
Bid Date: Mar 27 2024
Marengo, IL
Bid Date: Dec 06 2023
Marengo, IL
Bid Date: Nov 17 2023
Marengo, IL
Bid Date: Mar 12 2020
Marengo, IL
Bid Date: Feb 22 2022
Marengo, IL
Bid Date: Mar 09 2022
Marengo, IL
Bid Date: Mar 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.