Site work and paving for a mixed-use development in East Brunswick, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 27, 2024, Project has been awarded. Award amount is $2,773,996.46** CONTRACT #2024-01 2024 PAVEMENT MANAGEMENT PROGRAM The start date for construction of this project will be no later than March 15, 2024, and the completion date will be no later than November 30, 2024. This project consists of the reconstruction/re-surfacing of twenty-five (25) local streets. The project entails the following general quantities: Hot Mix Asphalt, Milling, 3" or less (89,167 S.Y), Roadway Excavation, Unclassified (1,055 C.Y.), Hot Mix Asphalt, Surface Course, 9.5M64 (4,311 Tons), Hot Mix Asphalt, Surface Course, 12.5M64 (10,155 Tons), Hot Mix Asphalt, Base Course, 19M64 (1,215 Tons), D.G.A.B.C, 6" Thick (3,295 S.Y.), Reset Manhole Casting (74 Units), 6"x 9"x 20" Concrete Vertical Curb (2,399 L.F.),, Concrete Sidewalk, 4" Thick (739 S.Y.), Detectable Warning Surface (53 S.Y.), Concrete Driveway, Reinforced, 6" Thick (325 S.Y.), Reconstructed Inlets, Type B, New Casting (127 Units), Traffic Markings Lines, 4" Wide (7,835 L.F.), Fertilizer, Topsoil, Seed & Mulch (1,630 S.Y.). Also included in this proposal are three (3) alternate bids: Alternate #1 - Municipal Parking Lot #3 Resurfacing: Hot Mix Asphalt, Milling, 3" or less (6,000 S.Y), Hot Mix Asphalt, Surface Course, 12.5M64 (850 Tons), Hot Mix Asphalt, Base Course, 9.5M64 (25 Tons), D.G.A.B.C, 6" Thick (100 S.Y.), Concrete Sidewalk, 4" Thick (60 S.Y.), Detectable Warning Surface (2 S.Y.), Reconstructed Inlets, Type A, New Casting (3 Units), Traffic Markings Lines, 4" Wide (5,300 L.F.), Traffic Markings Symbols (250 S.F.), Fertilizer, Topsoil, Seed & Mulch (30 S.Y.) Alternate #2 - Westwood Road Water Main Installation: Hot Mix Asphalt, Milling, 3" or less (3,900 S.Y), Roadway Excavation, Unclassified (75 C.Y.), Hot Mix Asphalt, Surface Course, 12.5M64 (575 Tons), 8" Ductile Iron Pipe, Class 52 (1,160 L.F.), Hydrants (2 units), 8" Gate Valve (5 units), 6" Gate Valve (2 Units), 1" Type K Copper Service (260 L.F.), Curb Box & Service Connection (16 Units), Trench Restoration (490 S.Y.), Fertilizer, Topsoil, Seed & Mulch (70 S.Y.). Alternate #3 - Heavenly Farms Access Drive Paving: Hot Mix Asphalt, Milling, 3" or less (1,575 S.Y), Hot Mix Asphalt, Surface Course, 12.5M64 (230 Tons), Traffic Markings Lines, 4" Wide (200 L.F.), Traffic Markings Lines, 6" Wide (1,500 L.F.), Traffic Markings Symbols (175 S.F.), Fertilizer, Regulatory and Warning Signs (90 S.F.). Proposals must be made on the Standard Proposal Forms in the manner designated in Section 102 of the Contract Documents, must be hand delivered or mailed by certified mail, must be enclosed in sealed envelopes bearing the name and address of the Bidder and the name of the work on the outside, must be addressed to the Township of East Brunswick, and must be accompanied by a statement of Consent of Surety from a surety company authorized to do business in the State of New Jersey and acceptable to the Township of East Brunswick. Each bid must be accompanied by a certified check or cash in the amount of not less than ten (10%) percent, except that the amount shall not exceed $20,000.00, of the bid payable without any conditional endorsement as a guarantee that, in case the Contract is awarded to the bidder, he will, within 5 Municipal Business Days thereafter, execute such Contract and furnish satisfactory performance bond. Upon failure to do so he shall forfeit the deposit as liquidated damages and the acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. No interest shall be allowed upon any such certified check or cash. A bid bond in the amount of ten (10%) percent of the bid may be substituted for certified check or cash. All bid security except the security of the three apparent lowest responsible bidders shall be returned, unless otherwise requested by the bidder, within 10 days after the opening of the bids. Sundays and holidays excepted, and the bids of such bidders shall be considered as withdrawn. Within 3 days, Sundays and holidays excepted, after the awarding and signing of the contract and the approval of the contractor's performance bond, the bid security of the remaining unsuccessful bidders shall be returned to them. Each bid must also be accompanied by a certificate from a bonding company licensed to do business in the State of New Jersey and acceptable to the Township guaranteeing that, if the proposal of the bidder be accepted, they will furnish the bond set forth in Subsection 103.05 of the General Conditions of the Contract and the acceptance of the bid will be contingent upon the fulfillment of this requirement. A corporation submitting a bid, in response to this advertisement, shall accompany such bid with a resolution authorizing its proper officers to submit such a bid and authorize said officers to execute a contract in the event its bid is accepted. The Township of East Brunswick reserves the right to reject any and/or all bids or to waive any formalities, minor irregularities and immaterial variances in the form of bids if, in its opinion, it is in the best interest of the Township to do so. Attorneys in fact who sign contract bonds must file with each bond a certified and effectively dated copy of their power of attorney. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. All questions about the meaning or the intent of the Contract Documents shall be submitted to ENGINEER in writing. Replies will be issued by addenda, mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than seven Municipal Business Days prior to the date for opening of bids will not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarification will be without legal affect.

Award

Roads / Highways

$2,773,996.00

Public - City

Paving, Site Work

19

5

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
195
Bidding Soon
4,998
All Active Projects
2,051
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

March 15, 2024

img_map_placeholder

Multiple Locations, East Brunswick, NJ

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2024 Pavement Management Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.