BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work and paving for a mixed-use development in Cresbard, South Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of March 27, 2024 project was awarded to H&W Contracting with an amount of $4,731,213.28. ** This project includes replacement of water main and services, separation of storm sewer from existing sanitary, and installation of new storm sewer. This project includes approximately 10,000 T Base Course, 750 T Asphalt, 15,576 LF Water Main and 5,791 LF of Storm Sewer varying from 15 inches to 30 inches. Site Directions: City of Cresbard, South Dakota Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Permissible questions shall be submitted to April A. Buller, PE (April.A.Buller@imegcorp.com) A pre-bid conference will not be conducted for this Project Disadvantaged/Minority Business Enterprises 4.0% Womens Business Enterprises 4.0% Est. Value Notes: $5,000,000 - $6,000,000 Est. Completion Date: Oct. 31, 2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$4,731,231.00

Public - City

Paving, Site Work

118

26

2

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
5
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

April 22, 2024

Project location map

Multiple Locations, Cresbard, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.