EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 1, 2024, the project was awarded to low bidder Vinton Construction Company, in the amount of $633,754.92.** Est. Completion Date: Oct. 25, 2024 This Contract consists of the following projects: 1. Reconstruction of MacArthur Drive from 150 feet west of Meadow Ct. to Dale St. Work includes the replacement of some Storm Sewers, Storm Manholes and Storm Inlets, Replacement of Sanitary Manhole Castings, Remove and Replace Defective Sections of 30" Concrete Curb and Gutter, Unclassified Excavation, Geo-Grid, 8" Breaker Run Stone, 8" C.A.B.C, 7" Concrete Pavement, Topsoil, Seed, and E-mat. 2. Reconstruction of Glenview Drive from Michigan Ave. to Seneca Lane. Work includes the replacement of some Storm Inlet Castings, Remove and Replace defective sections of 30" Concrete Curb and Gutter, Unclassified Excavation, Geo-Grid, 8" Breaker Run Stone, 8" C.A.B.C, 7" Concrete Pavement, Topsoil, Seed, and E-mat. The successful performance of theCONTRACT must be assured by a PERFORMANCE BOND executed by successful BIDDER in the full amount plus 10% of the CONTRACT on a form to be prepared by OWNER. Such BOND must also be executed by security BOND approved by the OWNER. A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty.

Award

Roads / Highways

$633,754.00

Public - City

Paving, Site Work

6

5

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
43
Bidding Soon
618
All Active Projects
252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

March 22, 2024

img_map_placeholder

Multiple Locations, Manitowoc, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Concrete Paving Program II - Macarthur & Glenview

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.