Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 15, 2024 at 8:00 PM
Updated September 6, 2025
Site work for a mixed-use development in San Diego, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
License Requirements A or C-34 Question Deadline 02/26/2024 Any questions related to this solicitation shall be submitted to: RRiego@sandiego.gov, Questions received less than 14 days prior to the date for opening of Bids may not be considered. Redwood Village Rolando Park Improv 2: Construction of approximately 20,580.65 linear feet (LF) (3.90 miles) of 8-inch polyvinyl chloride (PVC) water mains to replace existing 6-inch and 8-inch asbestos cement (AC) water mains and construction of approximately 40 feet of new 8-inch PVC water main via open trench. Abandon 2,231.64 LF (0.42 miles) of existing AC water main. The project also includes transferring existing water services from the to-beabandoned 8-inch water main on rock street to the 16-inch water main on the same street. Redwood Village Standpipe: Abandonment of 863 linear feet (0.16 mi) of 16" cast-iron pipe, installation of 350 linear feet (0.07 mi) of new 12" PVC water main, and replacement of 176 linear feet (0.03 mi) of 8" asbestos cement water main with 12" pipeline. 1. SLBE participation 8.4% 2. ELBE participation 13.9% 3. Total mandatory participation 22.3% Estimated Bid Value $10,800,000.00 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%
Bid Results
Playgrounds / Parks / Athletic Fields
$13,231,605.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2024
May 10, 2024
Multiple Locations, San Diego, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
