Published April 11, 2024 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for an educational facility in Princeton, New Jersey. Completed plans call for site work for a educational facility; and educational facility.

A. This section describesthe requirementsfor completion of interim milestone events and final completion of all work required by the contract documents. B. Related Sections: 1. Items of Work attached to the Certificate of Substantial Completion and establishing Final Completion Time as per Section 00800. C. This section also establishes the relation of liquidated damages for failure to complete the interim milestone events or final completion requirements within the time requirements stated herein. D. The building (or part of the building) will be occupied at all times. The Contractor shall maintain heat, electric, fire safety systems and emergency egress paths, control dust and water infiltration at all times. Single Overall Contract (DPMC: C047) All requests for information (RFI) must be submitted in writing by February 29, 2024, and sent to info@fvhdpc.com or fax to 609-883-2694 or via common carrier to the Architect. All correspondence must include the Architect Project Name and Project Number referenced. The Architect is not responsible for misdirected or misrouted correspondence. Removal and replacement of the Natatorium Lighting and all associated work. Electrical Work includes: The work necessary for electrical power distribution, lighting, and the connections to equipment tied into such systems, including all work in accordance with drawings and specifications on the drawings. Also includes both administrative and coordination responsibilities. The Electrical Contractor is responsible for all coordination between his/her work and work of all Subcontractors. Work shall include power distribution and wiring for all indicated electrically operated equipment and fixtures, whether shown or not on drawings. Work shall include demolition and removals, as indicated, or required, to allow for new construction. Work shall include reinstallation, cutting, patching, finishing and repair work associate with Electrical work, as indicated or required. Alternate Bid No. 1: Project Phasing: New Lighting - Phase 1 / Demolition - Phase 2. Estimated Project Cost: $50,000.00 Project Start: 4/22/2024 Substantial Completion: 5/31/2024 Final Completion: 7/01/2024

Award

Educational

$78,000.00

Public - City

Outdoor Lighting, Site Work

10

7

2

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
547
Active Projects
299
Bidding Soon
4,957
All Active Projects
2,221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 10, 2024

img_map_placeholder

217 Walnut Ln, Princeton, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Natatorium Lighting Replacement At Princeton Middle School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.