BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2024 at 8:00 PM

Updated July 9, 2024

Remodeling of an educational facility in Hastings, Nebraska. Working plans call for the remodel of a educational facility.

As of July 8, 2024, project will be rebid. No definite date for rebid. The content of this manual is intended to assist contractors in reducing the possibility of accidents and to establish minimum standards to protect contractors, students, staff, faculty and visitors during construction operations. Safety is an essential component of construction work at Central Community College. The contractor is responsible for the safety of its employees, it is a key contractual responsibility for those managing and performing such work and an important dererminant of overall Project success. Bids signed and under seal, executed, dated, and submitted for the furnishing of all labor, materials, and equipment for the Central Community College - Hastings - Phelps Building Remodel. Offers will be opened publicly immediately after the time for receipt of bids. The Owner will consider the bids received for the furnishing of said labor, materials and equipment necessary for the proper construction of the aforesaid project. Prior to the start of the work, completed copies of the Certificate of Insurance, AIA Document G705 shall be submitted to the Owner and Architect. If shipping is required there is a non refundable amount determined and made payable to Standard Digital Imaging These checks are to be sent to Standard Digital Imaging prior to receipt of documents. The deposit will be returned in full only if a qualified bid is submitted and the Bid Documents are returned within fifteen (15) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Bid Documents are returned with seven (7) days prior to the bid opening. All bid documents shall be returned to the office of wilkins architecture design planning, l.L.C., 2908 west 39th street, suite a, kearney, nebraska, 68845. Question Deadline 02/26/2024 Clarifications requested by bidders must be in writing

Final Planning

Educational

$290,000.00

Public - State/Provincial

Remodeling

53

23

15

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

November 10, 2024

Project location map

550 S Technical Blvd, Hastings, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.