Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Concord, North Carolina. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
https://independenttribune.com/cabarrus-board-of-education-presented-with-10-year-capital-improvement-plan/article_fe07dd34-f750-11ee-9078-0f42bf48f0d5.html Cabarrus County Schools presented its proposed 10-year Capital Improvement Plan to the Board of Education during its Monday evening work session, which includes funding for several new schools along with the renovation of several current ones. The plan, which will be sent to the Cabarrus Board of Commissioners once approved, is comprised of 12 capital projects that are sequenced according to their level of priority. At the top of the list is the 150-seat replacement Opportunity School, which will be on the existing grounds of the Performing Learning Center campus. That is followed by the construction of a new Pre-K center, which will replace the Mary Frances Wall Center and will be developed on the current Beverly Hills location, and the 750-seat replacement school for Coltrane-Webb and Beverly Hills, which will be built on the Coltrane-Webb site. Capital Plan The 12 projects that are part of the 2023-24 Capital Improvements Plan. Cabarrus County Schools The prioritization sequencing of the projects can often vary year to year, CCS’ Executive Director of Construction Tim Lowder told the board, depending on projects the Board of Commissioners decide to fund. As certain projects receive funding and roll off the list, other projects move up in priority. People are also reading… Eli Lilly plans to start producing first medicines by end of 2024 10-year-old rescued by Harrisburg firefighters in storms' aftermath Student shot and killed in parking lot of Cabarrus charter school Friday Five: What's that going to be? One new item, one repeat “It’s more of a negotiation back and forth as to how much funding they (Board of Commissioners) will give us,” Lowder told the board, noting the commissioners are usually receptive to the district’s request, especially the top priorities. The top project during the 2022-23 sequencing, for example, was the construction of the new R. Brown McAllister Elementary school. Since the new facility is completed and students will transition to the school in August, the current R. Brown will serve as the swing school for Coltrane-Webb students, as their new school gets built. The new Coltrane-Webb/Beverly Hills replacement school, which was No. 9 during the 2022-23 sequencing, has moved to No. 3 with the current improvement plan. Other key projects that received funding last year include purchasing land for a high school in the southern part of the county and the new Cabarrus Health Sciences Institute, an early college high school which opened in August. 2022-23 Sequencing The 2022-2023 Capital plan, with green circles indicating projects that were funded by the Cabarrus Board of Commissioners. Cabarrus County Schools With the district expected to increase its student population by at least 5,000 over the next decade, two 940-seat elementary schools, which were not part of the 2022-23 sequencing, are priorities with the current improvement plan. The sequencing of projects can change year-to-year based on numerous factors, Lowder said, including funding, changes in the conditions of the facilities, student enrollment and cost of construction. Board member Keshia Sandidge expressed concern about why adding a high school section to Royal Oaks School of the Arts, which was the No. 4 project during the 2022-23 sequencing, was not one of the 12 projects as part of the current improvement plan. Lowder explained that the Board of Commissioners “were not really enthusiastic” about providing funding for that project. “Right now I think that growth is the bigger priority,” Superintendent Dr. John Kopicki said about Royal Oaks being taken off the improvement plan to allow for new schools to be built in major growth areas. Kopicki noted that the district still plans to convert Royal Oaks into a K-12 arts school. Board member Pamela Escobar questioned why building a replacement school for Central Cabarrus was a lower priority (No. 12) than constructing a new high school in the southern part of the county (No. 7). “I don’t understand why we’re talking about building a new high school when you can keep those kids at Central in the school and you can build on that land,” she said, noting high school students deserve to have state-of-the-art facilities. “Let’s think about the kids we have right now.” The Board of Education is slated to approve the capital plan during its regular meeting next Monday. --------------------------------------------------------------------------- Professional Construction Manager at Risk services (preconstruction and construction management) for the new Opportunity School Project located in Concord, NC.
Award
Educational
$5,300,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2024
July 1, 2024
To Be Determined, Concord, NC
Related To This Project
Concord, NC
Bid Date: Mar 13 2024
Concord, NC
Bid Date: Mar 20 2024
Concord, NC
Bid Date: Mar 20 2024
Concord, NC
Bid Date: Mar 20 2024
Concord, NC
Bid Date: Mar 05 2024
Concord, NC
Bid Date: Mar 26 2024
Concord, NC
Bid Date: Apr 03 2024
Concord, NC
Bid Date: Mar 22 2024
Concord, NC
Bid Date: Mar 06 2024
Concord, NC
Bid Date: Mar 06 2024
Concord, NC
Bid Date: Feb 20 2024
Concord, NC
Bid Date: Mar 10 2021
Concord, NC
Bid Date: Feb 21 2024
Concord, NC
Bid Date: Feb 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.