BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Concord, North Carolina. Completed plans call for the renovation of a educational facility.

As of June 17, 2024, the awarded general contractor is awaiting the Notice to Proceed from the owner. All trades have been awarded. Construction is anticipated to start by July 2024. The previous solicitation is listed below for reference. The owner has determined the following short list contractors: AVM Contractors LLC, Ike's Construction, Inc., G.W. Liles Construction Co., Inc., and Messer Construction Co. Building S202 is an existing 3-story classroom building of approximately 40,000 total square feet, originally constructed in 1999. Since then, various renovations have taken place within the building, including a welding lab renovation, replacement of some flooring and ceiling tile finishes, and replacement of some lighting fixtures. Work performed under this agreement is to be developed in accordance with the RCCC Facilities Design Manual and North Carolina State Construction Office requirements. The expected construction cost for the project is $1,760,714. Work will take place within an occupied building on an occupied campus. Work to the second and third floors must be completed over the College's summer schedule, between May 14, 2024 and the beginning of Fall Term on August 9, 2024, including Owner installed classroom technology, furniture and equipment. The remainder of the work will be completed on a schedule mutually agreed upon between the Owner and Contractor. Contractors shall be General Contractors, licensed in North Carolina. All Subcontractors to be used on the project shall be preapproved by the Owner. The Scope of Work for these renovations consists of the following: First Floor Renovations o Renovations to enlarge two (2) existing classrooms, including new drywall partitions, doors, carpet, ceilings and associated fire protection, plumbing, mechanical and electrical work. o Renovate existing classroom to house basic law enforcement training simulator. o New folding panel partition between classrooms with bracing to steel structure and drywall soffit and wall pocket for panel stacking. o Renovate existing office / classroom to office suite, including new drywall, carpet, ceilings and associated fire protection, plumbing, mechanical and electrical work. o Renovate existing classroom area into new lockers / toilet / shower area, including associated fire protection, plumbing, mechanical and electrical work. Second Floor Renovations o Renovations to convert three (3) classrooms into two (2) larger classrooms, including new drywall partition, doors and associated fire protection, plumbing, mechanical and electrical work. o Replace remaining original carpet, including rubber base in office areas. o Replace remaining original VCT with LVT, including rubber base in miscellaneous rooms Third Floor Renovations o Renovations to convert three (3) classrooms into two (2) larger classrooms, including new drywall partition, doors and associated fire protection, plumbing, mechanical and electrical work. o Replace remaining original carpet, including rubber base in office areas. o Replace remaining original VCT with LVT, including rubber base in miscellaneous rooms. Electrical Renovations o Power - Upgrades to main service panel, branch circuit panels, equipment connections, wiring and devices to current code and RCCC standards. o Data - Network changes, media upgrades to current RCCC standards. o Fire Alarm and Mass Notification - Fire alarm, mass notification, mass notification interface upgrades to current RCCC standards. o Security / CCTV - CCTV cameras, access controls, upgrades to current RCCC standards. o Additional electrical, data and fire alarm work are included within the individual floor renovations. HVAC Renovations o HVAC work is included within the individual floor renovations, such as providing exhaust for the new toilet / locker room area and modifications to air distribution systems in classrooms affected by the renovations. Plumbing Renovations o Plumbing work is included within the new locker room area on the first floor and primarily includes new toilets, lavatories and showers with associated domestic water and waste lines. Fire Sprinkler Renovations o Fire sprinkler work is included within the individual floor renovations and primarily consists of modifications to the sprinkler head layout per new floor plan layouts. *This project has been awarded and all trades have been let.

Award

Educational

$1,760,714.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
61
Bidding Soon
1,124
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

July 1, 2024

img_map_placeholder

1531 Trinity Church Rd, Concord, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.