BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Goliad, Texas. Completed plans call for the construction of a 79,381-square-foot educational facility; and for site work for a educational facility.

New Middle School Weaver & Jacobs Constructors, Inc. intends to subcontract with companies to provide Construction Services for the furnishing, fabrication, construction, and/or installation of the scope of work outlined in the construction documents. The work includes but is not limited to earthwork, site utilities, asphaltic paving, chain link fence and gates, termite control, concrete, pavement markings, masonry, miscellaneous metals, railings, rough carpentry, waterproofing, damp-proofing, sealants, insulation, metal panels, metal panels, roofing, hollow metal doors and frames, wood doors, overhead coiling doors, aluminum storefront, curtainwall and window systems, gypsum board assemblies, acoustical systems, tile, VCT, carpeting, wood floors, resinous flooring system, stained concrete floors, concrete floor sealer, painting, plastic laminate, toilet room specialties, louvers, marker boards/tack boards, graphics and signage, aluminum canopies, fire extinguishers, audio visual equipment, horizontal and backbone cable system, casework/millwork, music storage, blinds, plumbing, HVAC, Electrical, fire alarm, fire sprinkler system, electronic security, electric access controls, video surveillance, and all related work as defined by the documents included herein. This project consists of a new 79,381 square foot ground-up middle school building on an 18.5-acregreenfield site located in Goliad, Texas. The Middle School will accommodate Grades 6 through 8. The project site will have fenced athletic fields. There will be 2 vehicle entries that accommodate separate bus and parent drop-off / pick-up, and parking lots will be connected to each of the driveways. The project requires all new infrastructure to be run to the site from Church Street to the East and Ward Street to the North. There will be two main areas of the building: academic and athletic. These two sides will be split by a 2-hour rated fire wall. The two-hour rated fire wall will have double egress doors that will be open during school hours. For gym related events, during non-school hours, those doors will act as a lockable barrier/fail safe exit to the academic side of the building. There will be no storm shelter in the school. The gym entry will be located on the north side of the building and the main school entrance will be located on the East. The main entry will lead to the office and administration area. The west side of the building will be considered the "back of house" area which will be used for a fenced parking lot. Students will use the west side of the building to spill out onto the athletic fields. The South side of the building will have a fenced courtyard. Science, art, and other specials will have doors leading to this South side hardscaped and landscaped courtyard. Proposers must submit the following items if requested by Weaver & Jacobs Constructors, Inc. Preparation and Submittal Instructions: 1. Certification and signature section 2. Respondent's Pricing Proposal Scope sheets are requested to be received at least 48 hours from bid time. Quotes are to be received by fax or email by 4:00 PM on bid date. Please let us know if your firm will be bidding on this project. Thank you for your time.

Post-Bid

Educational

$30,000,000.00

Public - County

New Construction, Site Work

252

45

168

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
24
Bidding Soon
980
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

July 22, 2024

img_map_placeholder

SW Ward and Church Street Goliad, TX 77963, Goliad, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.