BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2024 at 8:00 PM

Updated April 6, 2024

Site work for a water / sewer project in Pensacola, Florida. Completed plans call for site work for a water / sewer project.

Reference Number 0000342396 The primary scope of work is the performance of maintenance dredging of Berths 1 and 2 along the western face of the Port of Pensacola facility. The detailed scope of work is as described below and/or as shown on the drawings. Maintenance Dredging: Maintenance dredging of approximately 2,462 cubic yards of material from Station 0+00 to Station 7+00 of the dredge area identified on the Drawings. Maintenance dredging may be undertaken by either mechanical or hydraulic means. Contractor shall clearly state the methodology and equipment it will use for the work in its bid package. Per the requirements of the U.S. Army Corps of Engineers Permit, dredging operations may only be undertaken during daylight hours. Dredge Material Placement: All dredge material will be placed in the confined dredge material placement area (DMPA) on the Port's property. The location of the DMPA is provided in the drawings. Contractor is responsible for inspecting the condition of the DMPA, inclusive of the weir structure, prior to bidding. Any improvements to the DMAP, inclusive of the weir structure that are necessary for the maintenance dredging operation shall be the responsibility of the Contractor and as such any and all costs associated with such improvements shall be included in the Contractor's bid. Contractor is hereby notified that the maintenance dredging work will consume approximately all of the available capacity of the DMPA. As such, Contractor shall account for any inefficiencies that may exist when conducting the work as the capacity of the DMPA is reached, in particular with the management of water in the DMPA while maintaining water quality standards at the weir and discharge location. Regulatory Conditions: Contractor shall undertake the work in strict compliance with the USACE and FDEP Permit conditions contained in Attachments A and B, respectively, to the Project Specifications. Question Deadline 03/04/2024 at 10:00 AM CT Questions are submitted online No, Any questions concerning the bid should be addressed and submitted in writing to Dedria Lunderman, Purchasing Manager City of Pensacola 222 W. Main St. Pensacola, FL 32502 purchasing@cityofpensacola.com . Bidders shall submit a certified check or bid bond, payable to the City of Pensacola in the amount of five percent (5%) of the base bid for a period of sixty (60) days. *The City of Pensacola reserves the right to accept or reject any or all bids, to award bids on a split-order basis by item number when applicable, to waive any bid informalities and to re-advertise for bids when deemed in the best interest of the City of Pensacola.

Award

Water / Sewer

$417,537.00

Public - City

Site Work

17

13

9

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
66
Bidding Soon
663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

May 13, 2024

Project location map

Multiple Locations, Pensacola, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.