BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in New Smyrna Beach, Florida. Contact the soliciting agency for additional information.

The City of New Smyrna Beach is requesting sealed qualifications from licensed Contractors to provide Demolition Services of both residential and commercial structures as designated by the City and within the City of New Smyrna Beach, Florida. The work shall consist of completely demolishing structures identified by survey for properties located within the jurisdiction of New Smyrna Beach, Florida. Structures shall be defined as, but not be limited to buildings (single story and/or multiple story), sheds, outbuildings, fences, swimming pools, decks, or other obstructions. Structures shall be completely demolished and cleared from the property as directed by the City Building Official. All sheds, porches, roofed areas, and other appurtenances, which are attached to the building, shall be considered a part of the building and shall be demolished and removed with the building. Steps, chimneys, column footings, other footings, foundation slabs, basements, or other foundation components shall be required to be removed as such structures are part of the scope of work. Qualified contractors shall be responsible for all applicable permits, inspections, labor, materials, equipment, tools, mobilization, supervision, and incidentals necessary to complete the demolition of a structure (including the proper removal and disposal of the debris and grading). The City assumes no liability for any equipment owned or leased by the Contractor. Work will also consist of repairing street(s) and sidewalk(s) if damaged during the demolition process. The Contractor agrees to commence work within Twenty (20) Days after the date of the Notice to Proceed and shall complete the work within Thirty (30) consecutive calendar days thereafter. All materials removed from the building or portions of building must be removed from the site daily wherever possible. When any part of the structure must be left standing or any debris remains on the property at the conclusion of the workday, the contractor must secure the area to minimize hazards. Services under an awarded contract includes, but not limited to: Perform a pre-construction inspection of the work area(s) prior to the commencement of work. The Contractor shall maintain a record (photographs, video or other documentation) of existing work area conditions. The City of New Smyrna Beach Building Official will conduct project inspections. Properly demolish, remove, and dispose of requested structure and its contents including permitted site improvements adjacent to structures. Demolition may require the removal of foundations and footings to a depth 2' below finish grade, concrete floors, driveways, curbs, streets, parking areas, walkways, buried fuel tanks, batteries, tires, and etcetera. Remove any remaining on grade concrete or asphalt not previously covered. Provide, install, and maintain any required erosion control for length of project. Provide and maintain any required barricading for site security for length of project. Contractor shall take all necessary precautions to avoid harming any existing vegetation. Contractor is responsible for adhering to city tree removal ordinances. Failure to comply with this requirement shall result in a fine. Resolving any interior hoarding shall be the Contractor's responsibility. Swimming pools shall be drained and shall have the bottom surface broken sufficiently to allow drainage of rainwater, and then filled using clean fill dirt at the unit price per cubic yard invoiced separately. The Contractor shall ensure that no rubble is buried on site other than the septic tank(s) and swimming pool as specified. Contractor shall be responsible for coordinating the disconnection of utilities servicing the designated structure(s) for demolition and removing existing utilities from structure to property line. The contractor shall cap or abandon all on-site utilities. Should water or electricity be necessary to accomplish the demolition work, the Contractor must secure it from an outside source, i.e., water truck, fire hydrant, local utility agency, generator or temporary pole. The Contractor must obtain approval and permits from respective agencies and/or utility providers. All costs incurred are the responsibility of the Contractor. Recommendation of award to City Commission:April 23, 2024 Question Deadline 02/23/2024 at 5:00 PM ET All questions related to this solicitation shall be submitted in electronically. All responses to questions will be in the form of an addendum that will be posted on electronically. Resulting contracts will be for an initial term of three (3) years with the possibility of one (1) optional two (2) year renewal terms upon mutual consent of the parties and approved by City Commission. The City reserves the right to solicit for additional services related to projects funded by state, federal and/or programmatic grants. Official Notice #2: Official Notice #2: Rescheduled Evaluation MeetingApr 4, 2024 5:08 PM The Evaluation meeting has been rescheduled for 9:00 AM on April 8th. Microsoft Teams meeting: Call-in (audio only) 786-636-1338 Phone conference ID: 405 530 037#

Post-Bid

Residential Subdivision

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
75
Bidding Soon
1,017
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 24, 2024

img_map_placeholder

Multiple Locations, New Smyrna Beach, FL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.