BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work and paving for a sidewalk / parking lot in Milwaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The objective of this contract is to perform stump grinding, stump spoil removal and site restoration work typically between the curb and sidewalk in the right of way throughout the City of Milwaukee bounded by the following geographical areas. Time for Completion: All assigned work, up to the maximum contract dollar amount, shall be completed no later than November 8, 2024 beginning five (5) working days from the date of issuance of the Notice to Proceed. Anticipated start date (when the Notice to Proceed may be issued]: approximately April 15, 2024. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: $500. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the City's contract compliance software Ifthere are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. Bid Results: PROJECT NO. 1: STUMP GRINDING, REMOVAL, & SITE RESTORATION: SOUTH FORESTRY DISTRICT: Area approximately bounded by W. Morgan Ave. to South city limits TREES R US INC $199,377.50 PROJECT NO. 2: STUMP GRINDING, REMOVAL, & SITE RESTORATION: SOUTH FORESTRY DISTRICT: Area approximately bounded by W I-94 to W. Morgan Ave. ROCKSTAR LANDSCAPING & PLOWING LLC $184,471.00 Trees R Us Inc $215,915.00 PROJECT NO. 3: STUMP GRINDING, REMOVAL, & SITE RESTORATION: CENTRAL FORESTRY DISTRICT: Area approximately bounded by W. Center St. to W I-94 TREES R US INC $282,683.75 PROJECT NO. 4: STUMP GRINDING, REMOVAL, & SITE RESTORATION: CENTRAL FORESTRY DISTRICT: Area approximately bounded by W. Congress to W. Center St. & N. Sherman Blvd. to Lake Michigan TREES R US INC $289,400.00 PROJECT NO. 5: STUMP GRINDING, REMOVAL, & SITE RESTORATION: NORTH FORESTRY DISTRICT: Area approximately bounded by W. Center St. to W. Hampton Ave. Non-responsive PROJECT NO. 6: STUMP GRINDING, REMOVAL, & SITE RESTORATION: NORTH FORESTRY DISTRICT: Area approximately bounded by W. Hampton Ave. to North city limits TREES R US INC $278,111.25

Bid Results

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
185
Bidding Soon
1,947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

April 15, 2024

Project location map

Multiple Locations, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.