BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Milwaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The objective of this contract is to perform stump grinding, stump spoil removal and site restoration work typically between the curb and sidewalk in the right of way throughout the City of Milwaukee bounded by the following geographical areas. Time for Completion: All assigned work, up to the maximum contract dollar amount, shall be completed no later than November 8, 2024 beginning five (5) working days from the date of issuance of the Notice to Proceed. Anticipated start date (when the Notice to Proceed may be issued]: approximately April 15, 2024. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: $500. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the City's contract compliance software Ifthere are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. Bid Results: PROJECT NO. 1: STUMP GRINDING, REMOVAL, & SITE RESTORATION: SOUTH FORESTRY DISTRICT: Area approximately bounded by W. Morgan Ave. to South city limits TREES R US INC $199,377.50 PROJECT NO. 2: STUMP GRINDING, REMOVAL, & SITE RESTORATION: SOUTH FORESTRY DISTRICT: Area approximately bounded by W I-94 to W. Morgan Ave. ROCKSTAR LANDSCAPING & PLOWING LLC $184,471.00 Trees R Us Inc $215,915.00 PROJECT NO. 3: STUMP GRINDING, REMOVAL, & SITE RESTORATION: CENTRAL FORESTRY DISTRICT: Area approximately bounded by W. Center St. to W I-94 TREES R US INC $282,683.75 PROJECT NO. 4: STUMP GRINDING, REMOVAL, & SITE RESTORATION: CENTRAL FORESTRY DISTRICT: Area approximately bounded by W. Congress to W. Center St. & N. Sherman Blvd. to Lake Michigan TREES R US INC $289,400.00 PROJECT NO. 5: STUMP GRINDING, REMOVAL, & SITE RESTORATION: NORTH FORESTRY DISTRICT: Area approximately bounded by W. Center St. to W. Hampton Ave. Non-responsive PROJECT NO. 6: STUMP GRINDING, REMOVAL, & SITE RESTORATION: NORTH FORESTRY DISTRICT: Area approximately bounded by W. Hampton Ave. to North city limits TREES R US INC $278,111.25

Bid Results

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
99
Bidding Soon
2,395
All Active Projects
882
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 4, 2024

April 15, 2024

November 8, 2024

img_map_placeholder

Multiple Locations, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.