Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Demolition, site work and new construction of a laboratory facility in Crest Hill, Illinois. Completed plans call for the construction of a 29,900-square-foot laboratory facility; 45,510-square-foot laboratory facility; and for the demolition of a laboratory facility.
Site: The site work includes the demolition of an existing decommissioned water tower and an adjacent one-story brick service building to provide space for two new buildings for the Illinois State Police. The site improvements include: Two vehicular entries from Division Street Parking for 224 passenger vehicles Fencing and enclosures for waste/recycling receptacles, transformers, emergency generators and on-grade chillers at the lab building. Site lighting Site security cameras Site signage All other work indicated on the construction documents. Utilities will be extended from West Division Street and the Stateville Correctional Center. Gas: Extended from existing gas services on Division Street. Electric: Extended from overhead power at the south side of Division Street. Communications: Extended from existing services. Domestic Water: Extended from Stateville Correctional Center water lines. Sanitary: Tied into existing Stateville Correctional Center sanitary system. Stormwater: Detained on site and discharges to Division Street right-of-way, maintaining existing drainage patterns. Utilities impacted by Division Street Road Widening Work: Utility pole relocation Communications vault relocation Buildings: New ISP District 5 Headquarters: 29,900 gross square foot, fully sprinkled, single story building with Gas fired/Direct Expansion RTUs. New ISP Joliet Forensic Science Laboratory: 45,510 gross square feet, fully sprinkled, single story building with roof top air handling units, boilers and chillers at grade, and humidification system. Both buildings include: Steel framed structures with concrete spread footings and slab-on-grade construction. Fiber cement rainscreen wall systems with continuous insulation thermal layer and cold formed metal framed walls. Fenestration consists of a combination of full height curtainwall glazing and aluminum ribbon windows. Roof includes a combination of metal deck and composite metal deck with a single ply PVC roof system over a minimum of R30 roof insulation and a combination of metal roof fascia and parapets with metal copings. Fire Alarm System Intrusion Detection System Each building has emergency power provided by separate diesel generators. All other work indicated on the construction documents. Division Street Improvements: Public roadway widening and drainage improvements of approximately 0.38 centerline miles. The roadway improvements include: Partial-depth asphalt milling Subgrade embankment widening and ditch grading. Construction of driveway culverts Construction of aggregate base course and shoulders. Construction of asphalt base and surface pavement courses and driveway connections. Construction of concrete combination curb and gutter. Placement of pavement markings and signage. Coordination with public utilities for relocation of facilities within the project limits.
GC Bidding
Laboratories
$70,000,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 19, 2026
July 20, 2026
19422 Division St, Crest Hill, IL
Related To This Project
Crest Hill, IL
Bid Date: May 02 2025
Crest Hill, IL
Bid Date: May 29 2025
Crest Hill, IL
Bid Date: Jun 26 2025
Crest Hill, IL
Bid Date: Jul 08 2025
Crest Hill, IL
Bid Date: Jul 10 2025
Crest Hill, IL
Bid Date: Jul 11 2025
Crest Hill, IL
Bid Date: Aug 07 2025
Crest Hill, IL
Bid Date: Aug 22 2025
Crest Hill, IL
Bid Date: Apr 30 2025
Crest Hill, IL
Bid Date: Mar 24 2025
Crest Hill, IL
Bid Date: May 01 2020
Crest Hill, IL
Bid Date: Nov 14 2024
Crest Hill, IL
Bid Date: Oct 10 2024
Crest Hill, IL
Bid Date: Aug 23 2024
Crest Hill, IL
Bid Date: Jul 25 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
