Site work for a water / sewer project in West Hartford, Connecticut. Completed plans call for site work for a water / sewer project.

2024 Storm Drainage Installation All Bidders Must File With Their Bid, a Certified Check, Treasurer's Check or Bid Bond Made Payable to the Town of West Hartford in the Amount of 10% of the Total Base Bid Price. If the amount of the contract to be awarded is Fifty Thousand Dollars ($50,000) or more, the successful Contract Bidder shall furnish and pay for the Surety favoring the Town of West Hartford in the full amount of the estimated total base bid as determined by extending the unit prices by the estimated quantities. This Bond shall provide 100% security for faithful performance and for payment of all persons performing labor or furnishing materials in connection with this Contract and shall be executed by a company authorized to transact business within the State of Connecticut. Any clarifications and / or addenda, as applicable, will be posted on online for addenda prior to submission of any proposal. No Bid May Be Withdrawn for a Period of 90 Days After the Opening of Bids Without the Approval and Written Consent of the Town of West Hartford. The Work Described Herein Shall Be Completed as Required. Unless Otherwise Stated, Time is of the Essence. 2.01.08 the Purpose of This Bid is to Secure a Contractor to Perform Work According to This Bid Document From the Date of Contract Signing to December 31, 2024. The Second Contract Year is From January 1, 2025 to December 31, 2025. The Third Contract Year is From January 1, 2026 to December 31, 2026. Project Sites Listed Are Generally on Residential Streets. However, Some Projects May Occur on Arterials and Collectors With Increased Traffic. If Mutually Agreeable to the Town and the Contactor, the Contract May Be Annually Extended for Up to Two Additional Years, the Terms and Prices of the Contract Will Remain the Same for Each Year of the Contract. The Contractor Shall Pay the Owner Liquidated Damages in the Amount of Fifty Dollars ($50.00) Per Calendar Day, Which Sum is Hereby Agreed Upon, and Shall Be Assessed Not as a Penalty, but as Liquidated Damages Which the Owner Shall Suffer by Reason of Such Default. The Owner and Contractor Shall Acknowledge That Failure to Effect Substantial Completion as Noted Above Will Precipitate Inconvenience and Disruption. The Owner and Contractor Shall Acknowledge That Such Damages Are Uncertain or Difficult to Prove and That the Amounts Established Herein Are Reasonable Assessment of These Damages. 2.01.09 All Prospective Bidders Are Hereby Notified That in Order to Obtain a Permit to Blast Within West Hartford, They Must Present Evidence of Adequate Insurance Protection by Filing a Properly Executed Copy of the Attached Public Liability Endorsement With the West Hartford Fire Department. The Right is Reserved to Reject Any and All Bids, to Waive Any Informalities in the Bidding and to Make Awards in Any Manner That is the Most Beneficial to the Town. Deviation From the Contract Bidding Documents May Render Such Bids Voidable at the Town's Sole Option. All Questions Must Be Emailed to Rick.hyman@westhartfordct.gov, at Least Seven Calendar Days Prior to the Date Established for the Opening of Bids. Do Not Call the Engineer/architect, Project Manager or Purchasing Office With Questions.

Award

Water / Sewer

$598,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
496
Active Projects
290
Bidding Soon
4,509
All Active Projects
1,904
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 27, 2024

img_map_placeholder

Multiple Locations, West Hartford, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.