Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2024 at 7:00 PM

Updated March 6, 2024

Renovation of a municipal facility in Ottawa, Ontario. Completed plans call for the renovation of a municipal facility.

Reference Number 0000264516 Pricing Lump sum Question Acceptance Deadline 2024/02/27 02:00:00 PM EST The scope of work includes but is not limited to supply and installation of conventionally glazed reinforced aluminum curtain wall system including project specific designed doors, glass thickness and glass types.The overall project involves full rehabilitation of an existing Office Tower at the Lester B Pearson Building in Ottawa, ON. Phase 3 of the Project Covers Tower C Located on the North-east Side of the Complex. The Tower Consists of Seven (7) Levels of Primarily Office Space Plus a Mechanical Penthouse. This Phase is Similar to Previous Phases 1 and 2, Involving the Removal of Interior Finishes (Except in Heritage Significant Areas), Mechanical and Electrical Services, and Exterior Enhancements Such as Precast Concrete Cladding, Curtain Wall Replacement, Terrace Roofing, Landscaping, Lighting, and Photovoltaic Solar Panels. During Construction of This Project, There Will Be Other Ongoing Projects. The Work Must Be Coordinated Accordingly Between These Concurrent Projects, While Maintaining the Required Separation of Time and Space So That the Responsibilities Associated With "Constructor" Remain With the Construction Manager. The Scope of Work Includes but is Not Limited to Supply and Installation of Conventionally Glazed Reinforced Aluminum Curtain Wall System Including Project Specific Designed Doors, Glass Thickness and Glass Types. Based on the Available Design Information, the Preliminary Estimated Cost for This Scope of Work is Valued Cad $25,300,000 for the Tower C Phase. The Work Will Begin Upon Contract Award and Will Be Executed Within the Construction Manager's Overall Construction Schedule. The Scheduled Duration for This Work Will Be Confirmed in the Second Stage of Tendering. The Work is Anticipated to Start in May 2025 and End Approximately in June 2026. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Municipal

$25,300,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
99
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

May 1, 2025

Project location map

125 Sussex Dr, Ottawa, ON

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed