BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Flint, Michigan. Design plans call for site work for a water / sewer project.

As of August 27, 2024, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Reference Number 0000342618 The existing Torrey Road booster pumping station has a total capacity of 4000 gallons per minute (gpm) and a firm capacity of 2000 gpm. This is an in-line pressure boosting facility that is designed for continuous duty. The City of Flint wishes to either upgrade the station to meet the requirements of the Michigan Safe Drinking Water Act (Act 399) and Ten States' Standards or construct a replacement station at a new location. The Engineering Firm must complete an Investigative Study of the Torrey Road Booster Station (on Hammerberg Road just north of Twelve Street by I-69) to determine six important factors. Question Deadline 02/20/2024 at 10:00 AM ET Questions are submitted online No. All written questions shall be directed to Lauren Rowley, Purchasing Manager to lrowley@cityofflint.com. *The City of Flint reserves the right to reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the City of Flint, or their designee, that the best interest of the City will be served by doing so. Online bid opening: Google Meet joining info Video call link: https://meet.google.com/mpp-ibee-hte Or dial: (US) +1 386-866-5497 PIN: 338 399 448# More phone numbers: https://tel.meet/mpp-ibee-hte pin=6724323053713 . Prebid meeting: Please submit a letter of intent to attend to Scott Dungee, Water Plant Supervisor at sdungee@cityofflint.com by Friday, February 16, 2024, at 2pm. Site visits can also be coordinated upon request through Scott Dungee, Water Plant Supervisor at sdungee@cityofflint.com. Failure to participate in this meeting may result in the disqualification of your bid.

Design

Water / Sewer

$150,000.00

Public - City

Site Work

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
69
Bidding Soon
1,339
All Active Projects
528
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

img_map_placeholder

Torrey Rd, Flint, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.