Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Algonquin, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of April 30, 2024 this project was awarded to Builders Paving, LLC, with the awarded amount of $5,348,024.03. The Work is called Willoughby Farms Section 1 Rehabilitation and shall consist of full depth reclamation and street resurfacing on Stonegate Road, Waverly Lane, Dorchester Avenue, Haverford Drive, White Oak Drive, Peach Tree Lane, Cloverdale Lane, Arbordale Lane, Fernwood Lane, White Oak Court, Cloverdale Court, Driftwood Court, Arbordale Court, Dorchester Court, Dellwood Court, Cedar Grove Court, Peach Tree Court, and Fernwood Court. The project will also include spot curb and gutter, sidewalk, and driveway replacement and utility rehabilitation. The project also includes a new on-street bike lane on Stonegate Road, an 8-foot wide shared-use path along the west and north sides of Willoughby Farms Park, drainage improvements, and landscape restoration. All questions regarding this project should be directed to David Kleinwachter, Christopher B. Burke Engineering, Ltd., at dkleinwachter@cbbel.com, or (847) 823-0500. Bid proposals for this project will be considered not only on the basis of cost, but also on past performance, experience and ability to perform the work. Owner Rights: The Village of Algonquin reserves the right to accept the bid deemed to be in its own best interest, which is based on all of the above considerations. Bid will be awarded to the lowest responsible bidder determined in the exclusive discretion of the Village Board of Trustees. The Village of Algonquin reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the Village. Doc Notes: The pertinent documents can be reviewed at the office of the Village Clerk, 2200 Harnish Dr., Algonquin, IL 60102. Electronic copies of "Willoughby Farms Section 1 Rehabilitation." Plans, Specifications, and Contract Documents may be obtained for free online(the project will be listed near the bottom of the page). A compact disc of the information may also be obtained at the Village of Algonquin, Office of the Village Clerk, Ganek Municipal Center, 2200 Harnish Drive, Algonquin, Illinois 60102, upon receipt of a $10.00 non-refundable deposit. If mailing is requested an additional $5.00 deposit will be required. Bid Bond : All bid proposals must be accompanied by a bid bond, certified check, or bank cashier's check payable to the Village of Algonquin for 5% of the amount of the base bid as provided in the Bidding Documents. No proposals or bids will be considered unless accompanied by such bond or check. This contract calls for the construction of a "public works," within the meaning of the Illinois Prevailing Wage Act, 821 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than current "prevailing rate of wages" (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor publishes the prevailing wage rates on its website.HTM. The Illinois Department of Labor revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Illinois Department of Labor website for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor"s website. All questions regarding this project should be directed to David Kleinwachter, P.E., Christopher B. Burke Engineering, Ltd. at dkleinwachter@cbbel.com or (847-823-0500)
Award
Roads / Highways
$5,348,024.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2024
April 1, 2024
2001 Wynnfield Dr, Algonquin, IL
Related To This Project
Algonquin, IL
Bid Date: Mar 12 2024
Algonquin, IL
Bid Date: Mar 06 2024
Algonquin, IL
--
Algonquin, IL
Bid Date: Mar 28 2024
Algonquin, IL
Bid Date: Mar 28 2024
Algonquin, IL
Bid Date: Apr 09 2024
Algonquin, IL
Bid Date: Apr 18 2024
Algonquin, IL
Bid Date: Apr 25 2024
Algonquin, IL
Bid Date: Jan 28 2021
Algonquin, IL
Bid Date: Feb 27 2024
Algonquin, IL
Bid Date: Mar 11 2024
Algonquin, IL
Bid Date: Oct 28 2019
Algonquin, IL
Bid Date: Jan 30 2024
Algonquin, IL
Bid Date: Dec 21 2023
Algonquin, IL
Bid Date: Jan 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.