Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Scranton, Pennsylvania. Contact the soliciting agency for additional information.
Lackawanna County requests proposals from qualified consulting firms to prepare a Comprehensive Safety Action Plan. This project will be funded with federal funds and the maximum consultant budget is $225,000. The Consultant must comply with all federal procurement requirements. Lackawanna County reserves the right to accept or reject any proposals or to make no award at all, extend the period for accepting proposals, advertise the RFP at any time, and waive any minor irregularities in any proposals. Please note that no information given will be binding upon the County unless such notification is issued in writing as an official addendum to this RFP. Purpose of Request Lackawanna County, Pennsylvania, [population: 215,896] will develop a Safety Action Plan with strong emphasis on equity and citizen participation. To establish roadway safety goals, the governance framework, and identify implementation projects, a comprehensive planning process is required. Federal support is necessary for robust public engagement, data collection/assessment, and reviewing promising Safety Action Plan models. This Safety Action Plan will greatly benefit Lackawanna County's efforts to invest in future transportation improvements strategically and equitably. There are 1,627.36 linear miles of public roadways in Lackawanna County. Major highways traversing the county include Interstates 81, 84, 380, the northeast extension of the Pennsylvania Turnpike (I-476), US Route 6 (Governor Robert Casey Highway), US Route 11, PA Route 307, and Business Route 6 (Scranton-Carbondale Highway). Over the fiveyear span from 2018-2022, there have been a total of 12,145 crashes reported in Lackawanna County. Lackawanna County has unfortunately averaged 20 fatal accidents per year over the same five-year span. The Safety Action Plan will provide a framework of innovative strategies and implementation actions intended to reduce transportation-related fatalities and serious injuries while also supporting federal safety initiatives. The Safety Action Plan will identify safety issues and specific actions that can be implemented to improve safety for people traveling by any mode throughout the region. The plan will develop recommendations for both motorized and non- motorized modes in the roadway network as well as other elements including land use, transit, freight, and other community factors to create a comprehensive course of action. The plan will address federal and state regulations, performance management goals, measures, and targets, and will promote equitable outcomes. As noted, this plan will be funded through an Action Plan Grant through the Safe Streets and Roads for All (SS4A) discretionary grant program. The purpose of this program, established by the Bipartisan Infrastructure Law (BIL), is to support local initiatives to prevent death and serious injury on roads and streets, including pedestrians, bicyclists, public transportation users, motorists, personal conveyance and micro-mobility users, and commercial vehicle operators. Once complete, the Action Plan will allow Lackawanna County and its 40 municipalities to apply for implementation discretionary grant funds through the SS4A initiative. The project will be led by the Lackawanna County Planning and Economic Development Department, with guidance from PennDOT, the Lackawanna Luzerne MPO, and the 40 municipalities within Lackawanna County. Federal funds will be used to procure professional consultant(s) to assist with the safety analysis, community engagement, and a written plan with measurements and specific project recommendations based on data and public input. Scope of Work The Safety Action Plan developed through this planning process will outline Lackawanna County's strategy to prevent fatalities and serious injuries within the County. The Safety Action plan should include all the components laid out by the U.S. Department of Transportation to successfully apply for implementation funds. These components can be referenced in Table 1 in the SS4A 2023 NOFO o Project Management: The consultant will manage the study and coordinate plan documentation, public engagement events, data collection, and stakeholder coordination. The consultant will host regular meetings with the Lackawanna County staff assigned to this planning process and will submit monthly progress reports including performed work, upcoming events and milestones, and status of the schedule. o Stakeholder and Public Engagement: The consultant will develop and implement a robust stakeholder and public engagement plan for the planning process. A strong emphasis should be placed on equity in outreach activities, new American, and economically disadvantaged communities. At a minimum, this engagement schedule should include the following: o Identification of and engagement activities for groups disproportionately impacted by traffic risks and are not typically engaged by safety planning. o Online and in-person communication strategy for sharing plan information and engagement events with residents and stakeholders. o Steering committee of diverse community stakeholders and residents that provides direction and feedback on the planning process. o Identification of, and engagement activities for, stakeholder groups. o A minimum of 4 engaging public events in each of the four county planning regions to garner feedback on plan recommendations. o Data Collection: The consultant will collect and review existing programs, policies, planning documents and provide a summary of the current state of efforts to address transportation safety in Lackawanna County. The consultant should provide a summary of best practices employed by municipalities of a similar size. o Safety Analysis: The consultant will analyze existing safety conditions and trends related to crashes in the County. The consultant will analyze contributing factors as well as crash types. Other analysis includes high-risk road features, specific safety needs of diverse road users, connections to public and environmental health, analysis of the built environment, demographic, and structural issues, etc. The analysis should include all roadways within Lackawanna County, without regard for ownership. o Transportation Equity Review: An analysis of transportation systems, services, infrastructure, and processes that support safe, reliable, and intuitive multimodal options that are accessible to all populations. Recommendations should be prepared to ensure equity in the planning process including strategies to reduce socioeconomic disparities experienced by underserved and underrepresented communities. o Implementation Matrix: The consultant will develop an implementation matrix that identifies potential projects, strategies, recommendations, and a schedule for future grant opportunities. Along with larger projects, the matrix should include regular maintenance and update cycles to stay in compliance and in line with safety best practices. The implementation matrix will recognize the County's diversity of road users. Considerations should be made for fiscal and staff capacity required to achieve traffic safety goals and meet SS4A objectives after plan adoption. A project readiness timeline for each strategy and project should be included for short-term (0-5 years), mid-term (5-10 years), and long-term (10+ years). o Administrative Draft/ Final Plan: The consultant will prepare an administrative draft of the Safety Plan for staff and steering committee review prior to finalization of the document. The final draft should be visually appealing, easy to read and available in digital and print formats. o Executive Summary and Fact Sheet: The consultant shall develop an executive summary with a fact sheet to easily communicate high level planning document takeaways. The summary should include graphics, plan highlights and be visually engaging and available in digital and print formats. o Deliverables: Following completion of the planning process, the consultant will provide the County with the final planning document in PDF format. All data and study products collected during the planning process must also be included. The consultant must provide 20 bound print copies of the final planning document. All questions regarding the RFP shall be submitted by email no later than 4 PM on FEBRUARY 7, 2024. Questions shall be submitted to the County contact named above at Middletone@lackawannacounty.org Terms & Conditions 1) Lackawanna County reserves the right to reject any or all proposals or to award the contract to the next most qualified firm if the successful firm does not execute a contract within thirty (30) days after the award of the proposal. Lackawanna County shall not pay for any information contained in proposals obtained from participating firms. 2) Lackawanna County reserves the right to request clarification on any information submitted and additionally reserves the right to request additional information of one (1) or more applicants. 3) If, through any cause, the consultant shall fail to fulfill in a timely and proper manner the obligations agreed to, Lackawanna County shall have the right to terminate its contract by specifying the date of termination in a written notice to the firm at least ninety (90)working days before the termination date. In this event, the firm shall be entitled to just and equitable compensation for any satisfactory work completed. 4)All documents submitted as part of the consultant's offering will be deemed confidential during the evaluation process.
Post-Bid
Roads / Highways
$225,000.00
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 29, 2024
June 15, 2024
Multiple Locations, Scranton, PA
Related To This Project
Scranton, PA
Bid Date: Mar 28 2024
Scranton, PA
Bid Date: Mar 07 2024
Scranton, PA
Bid Date: Mar 15 2024
Scranton, PA
Bid Date: Mar 27 2024
Scranton, PA
Bid Date: Apr 03 2024
Scranton, PA
--
Scranton, PA
Bid Date: Apr 26 2024
Scranton, PA
Bid Date: Apr 30 2024
Scranton, PA
--
Scranton, PA
Bid Date: Feb 15 2024
Scranton, PA
Bid Date: Jan 24 2024
Scranton, PA
Bid Date: Feb 22 2024
Scranton, PA
Bid Date: Feb 22 2024
Scranton, PA
Bid Date: Feb 20 2024
Scranton, PA
Bid Date: Feb 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.