BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a residential development in Worcester, Massachusetts. Completed plans call for the demolition of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Questions are due by 3/4/24 at 4:00 PM. Selective demolition of interior non-structural building components and systems to expose existing structure at: floors, walls and ceilings, asbestos abatement, and other Work indicated in the Contract Documents. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates), and made payable to The WORCESTER HOUSING AUTHORITY. Note: A bid deposite is not required for Projects advertised under $50,000 Location- 24 Mill Street, Worcester, MA Goals for minority participation for each trade: 1.6 Goals for female participation for each trade: 6.9 The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Selective demolition of interior non-structural building components and systems to expose existing structure at; floors, walls and ceilings, asbestos abatement and other Work indicated in the Contract Documents. 2. Owner shall be responsible for work related to the following trades: HVAC, Electrical, Plumbing, Fire Alarm and Fire Protection. Work by Owner consist of disconnect and make safe as required for selective demolition. 3. Removal and disposal of HVAC, Electrical, Plumbing, Fire Alarm and Fire Protection equipment and related materials shall be by the Contractor. 4. Contractor shall be responsible to schedule and coordinate; HVAC, Electrical, Plumbing, Fire Alarm and Fire Protection work with the Owner. 5. Owner shall be responsible for temporary utilities shut down during construction. Shut down consist of water, electrical and gas. 6. Contractor shall be responsible for Fire-Safety Program, compliance with requirements of NFPA 241 and authorities having jurisdiction including Worcester Fire Department. 7. Owner shall be responsible of maintaining existing fire protection (sprinkler system) operational as required by NFPA 241 and authorities having jurisdiction including Worcester Fire Department during Project duration. Contractor shall be responsible to coordinate and schedule this work with the Owner. 8. Owner shall be responsible for fire alarm as required by NFPA 241 and authorities having jurisdiction including Worcester Fire Department during Project duration. Contractor shall be responsible to coordinate and schedule this work with the Owner. 9. Contractor shall be responsible for fire watch as per Worcester Fire Department requirements and authorities having jurisdiction. 10. Contractor shall be responsible to maintain building egresses clear and safe during construction. Project Duration: (90) calendar days.

Award

Residential Subdivision

$245,784.00

Public - City

Asbestos Abatement, Demolition, Site Work

10

14

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
670
Active Projects
408
Bidding Soon
5,443
All Active Projects
2,258
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 7, 2024

April 8, 2024

July 7, 2024

img_map_placeholder

24 Mill St, Worcester, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.