EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a stadium in Johnstown, Pennsylvania. Completed plans call for the addition of a stadium; for the demolition of a stadium; for the renovation of a stadium; and for site work for a stadium.

The Contracts consist of the demolition of existing locker rooms and construction of locker room upgrades within the 1 st Summit Arena (Cambria County War Memorial), Johnstown, Cambria County, Pennsylvania including but not limited to architecture, structural, mechanical, plumbing, and electrical upgrades. Contract No. 2024-01 General Construction Contract No. 2024-02 Plumbing Construction Contract No. 2024-03 HVAC Construction Contract No. 2024-04 Electrical Construction Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work. Prior to the award of the contract, the successful bidder(s) shall furnish a satisfactory Performance Bond and a Labor and Material Payment Bond to the Owner, in the form contained in the Contract Documents and executed by a satisfactory circular 570 listed surety, each equal to 100% of the total contract amount. The bidder(s) will also furnish evidence of insurance coverage as required by the contract documents. The obligations imposed on the Owner by the financing agency shall apply to and be acceptable to the successful bidder. Funding for this project is being provided in part by the Owner and the Commonwealth of Pennsylvania, Redevelopment Assistance Capital Program (RACP). The Contractor(s) shall adhere to the provisions of the Pennsylvania Prevailing Wage Rates as set forth in the Contract Documents. Bidder(s) must comply with all State anti-bid-rigging regulations pertaining to work associated with this project and will be required to submit an executed non-collusion affidavit with the bid. The successful bidder(s) will be required to complete all work within 155 consecutive calendar days from, and including, the date indicated by the Owner in their written Notice to Proceed. Bidding Documents may be obtained from The EADS Group, Inc., [during the hours indicated above], upon payment of a non-refundable fee of $100.00 for printed format or $25.00 for electronic format, both of which includes 6% Pennsylvania sales tax. Checks for Bidding Documents shall be payable to "The EADS Group, Inc." To access the electronic format, the bidder must have a valid e-mail address and will require internet connection. Bidders must purchase Bidding Documents (in either format) from The EADS Group, Inc. to be eligible to bid this project. The Issuing Office for the Bidding Documents is: The EADS Group, Inc. (Engineer), 227 Franklin Street, Suite 300, Johnstown, Pennsylvania 15901. Telephone No. (814) 535-5388. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:30 A.M. and 4:00 P.M. and may obtain copies of the Bidding Documents from the Issuing Office as described below. Bidder agrees that the Work will be substantially complete within 125 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 155 calendar days after the date when the Contract Times commence to run. The Department of General Services is the Commonwealth agency responsible for enforcement and administration of the Act. Please direct questions about the Act to: Department of General Services Public Works Employment Verification Compliance Office Room 105 Tent Building 18th and Herr Streets Harrisburg, PA 17125 Fax: 717-214-3669 *Interested bidders must obtain their own set of documents from The EADS Group, Inc. to be eligible to bid the project. Bid Result: General Construction Mid state construction inc $347656 Plumbing Construction K&K Plumbing $190633 HVAC Construction Marc services $299275 Electrical Construction Hallstrom-Clark Electric, Inc. $101800

Bid Results

Arenas / Stadiums

$939,364.00

Public - County

Addition, Demolition, Renovation, Site Work

27

35

31

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Flexible Ducts, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
109
Bidding Soon
951
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 15, 2024

img_map_placeholder

326 Napoleon St, Johnstown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Locker Room Renovations at the 1st Summit Arena (Cambria County War Memorial) Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.