Published March 17, 2025 at 8:00 PM

Updated March 18, 2025

Demolition and site work for a development in Baltimore, Maryland. Completed plans call for the demolition of a development; and for site work for a development.

**As of March 7, 2025, project was awarded to Ballard Marine Construction, LLC,, awarded amount is $9,824,199.88. As of June 21, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. This work shall be considered part of the DMT Resiliency and Flood Mitigation project; the Sea Curb work includes selective demolition, removal, and salvage of existing features and components of DMT Berths 1-13 and adjacent areas, and construction of flood and storm surge resistant barrier structures, including both immovable (fixed) concrete systems and a variety of moveable (removable and deployable) systems. The demolition, removal, and salvage work includes: removal and disposal of cast steel cleats; selective removal and salvage of Fiber Reinforced Plastic (FRP) backing beam and associated components; removal and disposal or reinstallation of various site features and components that would otherwise interfere with immovable and movable barrier systems. New flood barrier construction consists of: slipformed reinforced concrete Sea Curb system; reinforced cast-in-place concrete parapet barrier system; removable barrier systems at vessel ramp opening locations consisting of precast concrete gravity blocks; deployable barrier systems at bollard and other opening locations consisting of hinged steel gate systems. Associated work includes provision of precast and/or cast-in-place concrete foundation elements, earthwork, paving, and scupper-type drainage systems at the fixed barrier systems. The contract awarded shall allow for 490 Calendar Days for the completion of all work under this contract. Failure of the Contractor to comply with this schedule, taking into account Contract extensions granted by the Administration due to change orders, shall result in the assessment of liquidated damages of ($1,409.00) for each day the work under the contract remains incomplete. Question Due Date: March 18, 2024, 2:00 PM Local Time Questions and other inquiries must be submitted to the Procurement Officer in writing. Questions subsequent to the pre-proposal meeting date are to be submitted in writing via email to the Procurement Officer

Award

Conservation and Development

$9,824,199.00

Public - State/Provincial

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
209
Bidding Soon
3,703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 30, 2024

Project location map

Multiple Locations, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.