BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2024 at 8:00 PM

Updated July 18, 2024

Site work, paving and outdoor lighting for a mixed-use development in Buffalo, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

CR Number: 2106403 The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: Install all new curb, curb bump-outs, drainage structures, sidewalk, street lighting and new traffic signals at Downing Street, Hollywood Avenue and Shenandoah Road, Woodside Avenue, and Lorraine Avenue and Cazenovia Street. Install a new Roundabout which will include the full depth reconstruction of the intersection of Red Jacket Parkway, Warren Spahn Way, Potters Road and Abbott Road. Question Deadline 03/06/2024 Questions regarding the Contract Documents should be directed to Joe Kleinmann CHA at jkleinmann@chasolutions.com. Bidders shall promptly notify Joe Kleinmann CHA at jkleinmann@chasolutions.com of any errors, omissions, conflicts, or ambiguity within the Contract Documents within seven (7) days of bid opening. No questions or inquiries regarding this bid will be accepted within three (3) business days prior to the bid opening. The EEO Employment goals for this project are: 7.7% Minority Employment Goal 6.9% Women Employment Goal Disadvantaged Owned Sub-Contracting Goal: 6% Service-Disabled Veteran-Owned Set Aside: No The work will be substantially completed 300 working days from Notice to Proceed. The City of Buffalo will not be responsible for full or partial set of Contract Documents, including any Addenda obtained from any other source. The City of Buffalo reserves the right to reject any and all bids and to waive any informalities therein. Document Note: Only by company check or money order made payable to the City of Buffalo, Dept. of Public Works, Parks and Streets. NO CASH AND NO PERSONAL CHECKS.

Award

Sidewalks / Parking Lot

$4,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

191

10

27

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
287
Bidding Soon
4,515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

August 14, 2024

Project location map

Abbott Rd, Buffalo, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.